Safety store

Earthmoving SWMS & WHS templates

SWMS, policies, forms and registers for earthmoving work in Queensland. Every template is an editable Word or Excel file you can brand as your own.

Can't find your task?

Tell us what you need. Popular requests get written and added to the store.

Request a template
Safe Operation of Drills SWMS

Safe Operation of Drills SWMS

$39.99

Office Safety SWMS

Office Safety SWMS

$39.99

Traffic Management SWMS

Traffic Management SWMS

$49.99

JSEA Policy (Job Safety & Environmental Analysis) Template

JSEA Policy (Job Safety & Environmental Analysis) Template

$6.99

Company Vehicle Policy Template

Company Vehicle Policy Template

$6.99

Front-End Loader SWMS

Front-End Loader SWMS

$49.99

COVID-19 SWMS

COVID-19 SWMS

$49.99

Monitoring & Review Policy Template

Monitoring & Review Policy Template

$6.99

Work at Heights Policy & Procedure Template

Work at Heights Policy & Procedure Template

$14.99

Return to Work Policy & Procedure Template

Return to Work Policy & Procedure Template

$14.99

Safe Work Premises Policy Template

Safe Work Premises Policy Template

$6.99

Disciplinary Action Policy & Procedure Template

Disciplinary Action Policy & Procedure Template

$6.99

Vehicle Service Report Form

Vehicle Service Report Form

$5.99

Safe Operation of Compressor SWMS

Safe Operation of Compressor SWMS

$39.99

Chain Trencher SWMS

Chain Trencher SWMS

$49.99

Back Injuries & Preventative Tips Toolbox Meeting Template

Back Injuries & Preventative Tips Toolbox Meeting Template

$4.99

Clothing Safety Guidelines Toolbox Meeting Template

Clothing Safety Guidelines Toolbox Meeting Template

$4.99

Hazard Management Policy Template

Hazard Management Policy Template

$6.99

Consultation, Communication & Training Policy Template

Consultation, Communication & Training Policy Template

$9.99

Workplace Amenities & Hygiene Policy Template

Workplace Amenities & Hygiene Policy Template

$6.99

Noise Management Policy Template

Noise Management Policy Template

$6.99

Visitor Policy Template

Visitor Policy Template

$6.99

Housekeeping Policy Template

Housekeeping Policy Template

$6.99

Document Control Policy & Procedure Template

Document Control Policy & Procedure Template

$9.99

Save with bundles

Buying more than two? Bundle it.

Compare all bundles
Policies & Procedures Bundle

Policies & Procedures Bundle

39 documents · save 31% on buying them separately

$250.00

Confined Spaces Bundle

Confined Spaces Bundle

5 documents · save 22% on buying them separately

$59.99

General Construction SWMS Bundle

General Construction SWMS Bundle

26 SWMS · save 37% on buying them separately

$760.00

Safety documents for earthmoving work in Queensland
Earthmoving puts trenches, heavy mobile plant, buried services and overhead lines on the same site. Work connected with an excavation is construction work (s 289(2)(f)), and a SWMS must be in place before high risk construction work starts (s 299). Items of s 291 that commonly apply include work in or near a trench or shaft deeper than 1.5 m (g), on or near energised electrical installations or services (k), and in areas where powered mobile plant moves (o).
Rules that come up in earthmoving work
Underground services: before excavation starts, the person with management or control of the workplace must take all reasonable steps to get current underground essential services information and give it to anyone they engage to do the excavation work (s 304).Trenches: for a trench at least 1.5 m deep, the work area must be secured against unauthorised access so far as is reasonably practicable, and all sides must be supported by shoring, benching or battering unless a geotechnical engineer gives written advice that the sides are safe from collapse (s 306).Mobile plant: manage the risks of overturning, operator ejection, things falling on the operator and collisions (s 214). Plant must not collide with pedestrians or other plant, with a warning device where a collision is possible (s 215).Electric lines: the Electrical Safety Regulation covers overhead lines (s 13) and underground lines (ss 14 and 15), including risk assessments where work risks contact.
Templates for earthmoving work
Excavator SWMS: for excavator digging, loading and travelFront-End Loader SWMS: for front-end loader workChain Trencher SWMS: for trenching with a chain trencherRigging & Dogging SWMS: where loads are slung from plantLifting Gear & Inspection Register: for slings and lifting gearPlant Risk Assessment Form: for a hazard check of each item of plant
Every template is an editable Word or Excel file you can brand with your logo, and you download it straight after checkout. Once filled in for your job, the documents help you meet your duties. Related reading: 7 steps to safe excavation and Dial Before You Dig in Queensland. This is general information, not legal advice.
Save with a bundle
Need several? Our trade bundles group the SWMS a job usually needs and save up to 37% on buying them separately.