
WHS Management Plan Template (Site Safety Management Plan)
Editable Word site safety management plan for Queensland construction projects: project details, roles, consultation, induction, SWMS register, risk register, site rules, emergencies, incidents and sign-off.
RG
Written by Ryan Graham, health and safety professional (16 years on Queensland sites)
$380.00 incl. GST
AUD · one-off purchase · instant download
- Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
- Make it yours in minutes · edit in Microsoft Word and add your logo
- Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
- Secure checkout · card, Apple Pay or Google Pay through Stripe
About this template
A site safety management plan, called a WHS management plan in Queensland law, is the written plan a principal contractor must prepare before work starts on a construction project. This editable Microsoft Word template is laid out so each thing the WHS Regulation 2011 (Qld) requires has its own part, with short guidance notes, registers and checklists, so you can fill it in for your project instead of writing it from scratch.
A WHS management plan for a Queensland construction project, laid out so every item the WHS Regulation requires of a principal contractor has its own part. It suits builders, head contractors and project managers on projects where the construction work costs $250,000 or more, and contractors who want a site plan for their own part of a project. It points to your policies, procedures, forms and registers by name instead of repeating them.
When is a WHS management plan required in Queensland?
A construction project is a project involving construction work that costs $250,000 or more (section 292). The business that commissions the project is the principal contractor, unless it engages another business to be the principal contractor and gives it management or control of the workplace (section 293). The principal contractor must prepare a written WHS management plan for the workplace before work on the project starts (section 309).
What the plan must include
Under section 309, the plan must set out:
- the names, positions and health and safety responsibilities of everyone with a specific safety role on the project
- how the businesses on site will consult, co-operate and co-ordinate their activities
- how work health and safety incidents will be managed
- any site-specific safety rules, and how everyone on site will be told about them
- how safe work method statements will be collected, assessed, monitored and reviewed
The principal contractor duties that go with the plan
- Tell workers about it: make sure everyone carrying out construction work knows what is in the plan, and that they can inspect it, before they start (section 310).
- Keep it up to date: review and revise it as the project changes, and tell workers about any revision (section 311).
- Get the SWMS: take all reasonable steps to obtain a copy of the SWMS for high risk construction work before that work starts (section 312).
- Keep it: keep a copy until the project is completed, or for at least 2 years after a notifiable incident on the project (section 313).
- Put up signs showing the principal contractor’s name, phone numbers including after hours, and where the site office is (section 308).
- Manage the site-wide risks: materials and waste, plant that is not in use, traffic near the site, and essential services (section 315).
Projects under $250,000
A WHS management plan is only mandatory for construction projects of $250,000 or more. On smaller jobs, many builders and contractors still use a cut-down site safety plan because clients, councils and head contractors ask for one, and it is the easiest way to show how you induct people, manage SWMS and control site hazards.
Documents that go with your site safety plan
- SWMS templates for every high risk construction work activity, or the full General Construction SWMS Bundle
- Site Safety Audit Checklist for your regular site inspections
- WHS Manual with the policies and procedures your plan refers to
- Free SWMS template for Queensland to see the layout before you buy
What is included in our site safety management plan?
- When a plan is required, and a table showing where each WHS Regulation requirement sits in the document
- Project and contact details, principal contractor signs, client information and a description of the work
- Roles and health and safety responsibilities, with names and contact details
- Consultation, cooperation and coordination between businesses, including how issues are resolved
- Site induction content, general construction induction card checks and an induction record
- SWMS arrangements and a SWMS register with review dates
- High risk construction work checklist, with the permits, licences and notices each one needs
- Site hazards and a project risk register with starter hazard prompts
- Site rules, with starter rules to keep, change or delete
- Site set-up, security, amenities, falls, excavation and falling objects checks, a site layout sketch box and the principal contractor’s further duties in WHS Regulation s 314
- Plant, electrical, hazardous chemicals, asbestos and silica dust checks
- Traffic summary, emergency plan, first aid, incident notification, inspections, subcontractor and licence registers, review and sign-off
What you get
- An editable Microsoft Word plan (21 pages), A4 portrait, to fill in on screen or print
- Short guidance notes on what Queensland law requires in each part
- Tables, tick boxes and date pickers that work in Word
- Business details typed once and filled in on every page, plus a space for your logo
- Amendments, sign-off and document control
Review it and adjust it to suit your business, your sites and the way your team works, and talk it through with your workers.
Site safety management plan: frequently asked questions
Is a site safety management plan the same as a WHS management plan?
Yes. Queensland's WHS Regulation calls it a WHS management plan. Builders often call it a site safety management plan, site safety plan or construction safety plan. They all mean the written plan a principal contractor prepares for a construction project.
When is a WHS management plan required in Queensland?
The principal contractor must prepare one before work starts on a construction project, which is a project involving construction work costing $250,000 or more (sections 292 and 309 of the WHS Regulation 2011).
Who has to prepare the WHS management plan?
The principal contractor. That is the business that commissions the construction project, or another business it engages and authorises to manage or control the workplace and carry out the principal contractor's duties.
What must a WHS management plan include?
The names, positions and safety responsibilities of people with specific safety roles; how businesses on site will consult, co-operate and co-ordinate; how incidents will be managed; any site-specific safety rules and how people are told about them; and how SWMS will be collected, assessed, monitored and reviewed.
How long must a WHS management plan be kept?
Until the construction project is completed. If a notifiable incident happens in connection with the project, keep it for at least 2 years after the incident (section 313).
Do subcontractors need their own site safety management plan?
The legal duty sits with the principal contractor. Subcontractors must follow the principal contractor's plan and provide SWMS for their high risk construction work, but many also keep their own site plan because head contractors often ask for one.
This is general information, not legal advice. Check the current law or talk to Workplace Health and Safety Queensland for your situation.
Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.
How to use it
From download to site in three steps
Buy and download
Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.
Make it yours
Open it in Microsoft Word or Excel. Add your logo, business details, site and job information, and adjust it to how the work is done.
Brief your crew
Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.
What format is it?
Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details.
How do I get it after I pay?
Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.
Is it compliant with Queensland law?
It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.
What if it isn't right for my job?
If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.
Only logged in customers who have purchased this product may leave a review.
More templates like this
$49.99


Traffic Management Plan
$49.99




Reviews