Safety store

Earthmoving SWMS & WHS templates

SWMS, policies, forms and registers for earthmoving work in Queensland. Every template is an editable Word or Excel file you can brand as your own.

Can't find your task?

Tell us what you need. Popular requests get written and added to the store.

Request a template
Free Incident Report Form Template

Free Incident Report Form Template

$0.00

Free Toolbox Meeting Template

Free Toolbox Meeting Template

$0.00

Free Risk Assessment Template

Free Risk Assessment Template

$0.00

Free Work Health & Safety Policy Template

Free Work Health & Safety Policy Template

$0.00

Free Hazard Report Form Template

Free Hazard Report Form Template

$0.00

Plant Risk Assessment Form

Plant Risk Assessment Form

$19.99

Employee Skills Matrix

Employee Skills Matrix

$0.00

Employee Training Register

Employee Training Register

$0.00

Employee Emergency Contact Register Template

Employee Emergency Contact Register Template

$0.00

Lifting Gear & Inspection Register

Lifting Gear & Inspection Register

$0.00

Confined Space Emergency Rescue Plan Template

Confined Space Emergency Rescue Plan Template

$0.00

Electrical Equipment Register

Electrical Equipment Register

$2.99

Daily Vehicle Pre-Start Checklist

Daily Vehicle Pre-Start Checklist

$5.99

Manual Handling SWMS

Manual Handling SWMS

$49.99

Site Safety Audit Checklist

Site Safety Audit Checklist

$49.99

Worksite Hazards SWMS

Worksite Hazards SWMS

$79.99

JSEA Form (Job Safety & Environmental Analysis) Template

JSEA Form (Job Safety & Environmental Analysis) Template

$19.99

Confined Spaces SWMS

Confined Spaces SWMS

$49.99

Excavator SWMS

Excavator SWMS

$49.99

Site Safety Management Plan

Site Safety Management Plan

$380.00

Safe Operation of Forklift SWMS

Safe Operation of Forklift SWMS

$39.99

Fatigue Management Policy & Procedure Template

Fatigue Management Policy & Procedure Template

$14.99

Risk Assessment for Manual Tasks Template

Risk Assessment for Manual Tasks Template

$14.99

Hazardous Chemical or Substance SWMS

Hazardous Chemical or Substance SWMS

$49.99

Save with bundles

Buying more than two? Bundle it.

Compare all bundles
Policies & Procedures Bundle

Policies & Procedures Bundle

39 documents · save 31% on buying them separately

$250.00

Confined Spaces Bundle

Confined Spaces Bundle

5 documents · save 22% on buying them separately

$59.99

General Construction SWMS Bundle

General Construction SWMS Bundle

26 SWMS · save 37% on buying them separately

$760.00

Safety documents for earthmoving work in Queensland
Earthmoving puts trenches, heavy mobile plant, buried services and overhead lines on the same site. Work connected with an excavation is construction work (s 289(2)(f)), and a SWMS must be in place before high risk construction work starts (s 299). Items of s 291 that commonly apply include work in or near a trench or shaft deeper than 1.5 m (g), on or near energised electrical installations or services (k), and in areas where powered mobile plant moves (o).
Rules that come up in earthmoving work
Underground services: before excavation starts, the person with management or control of the workplace must take all reasonable steps to get current underground essential services information and give it to anyone they engage to do the excavation work (s 304).Trenches: for a trench at least 1.5 m deep, the work area must be secured against unauthorised access so far as is reasonably practicable, and all sides must be supported by shoring, benching or battering unless a geotechnical engineer gives written advice that the sides are safe from collapse (s 306).Mobile plant: manage the risks of overturning, operator ejection, things falling on the operator and collisions (s 214). Plant must not collide with pedestrians or other plant, with a warning device where a collision is possible (s 215).Electric lines: the Electrical Safety Regulation covers overhead lines (s 13) and underground lines (ss 14 and 15), including risk assessments where work risks contact.
Templates for earthmoving work
Excavator SWMS: for excavator digging, loading and travelFront-End Loader SWMS: for front-end loader workChain Trencher SWMS: for trenching with a chain trencherRigging & Dogging SWMS: where loads are slung from plantLifting Gear & Inspection Register: for slings and lifting gearPlant Risk Assessment Form: for a hazard check of each item of plant
Every template is an editable Word or Excel file you can brand with your logo, and you download it straight after checkout. Once filled in for your job, the documents help you meet your duties. Related reading: 7 steps to safe excavation and Dial Before You Dig in Queensland. This is general information, not legal advice.
Save with a bundle
Need several? Our trade bundles group the SWMS a job usually needs and save up to 37% on buying them separately.