Safety store

Roofing SWMS & WHS templates

SWMS, policies, forms and registers for roofing work in Queensland. Every template is an editable Word or Excel file you can brand as your own.

Can't find your task?

Tell us what you need. Popular requests get written and added to the store.

Request a template
Fatigue Management Policy & Procedure Template

Fatigue Management Policy & Procedure Template

$14.99

Risk Assessment for Manual Tasks Template

Risk Assessment for Manual Tasks Template

$14.99

Electrical Equipment SWMS

Electrical Equipment SWMS

$39.99

Hazardous Chemical or Substance SWMS

Hazardous Chemical or Substance SWMS

$49.99

Rigging & Dogging SWMS

Rigging & Dogging SWMS

$79.99

Heat Stress & Working Outdoors SWMS

Heat Stress & Working Outdoors SWMS

$39.99

Concrete Saw SWMS

Concrete Saw SWMS

$39.99

Confined Space Risk Assessment

Confined Space Risk Assessment

$9.99

Grinder Operation SWMS

Grinder Operation SWMS

$39.99

Electrical Safety Policy & Procedure Template

Electrical Safety Policy & Procedure Template

$9.99

Cordless Power Tools SWMS

Cordless Power Tools SWMS

$39.99

Fitness For Work Policy Template

Fitness For Work Policy Template

$6.99

Drainage Installation SWMS

Drainage Installation SWMS

$29.99

Environmental Policy Template

Environmental Policy Template

$6.99

Confined Space Entry Permit

Confined Space Entry Permit

$9.99

WHS Manual Template

WHS Manual Template

$650.00

Non-Powered Hand Tools SWMS

Non-Powered Hand Tools SWMS

$39.99

Emergency Management Policy & Procedure Template

Emergency Management Policy & Procedure Template

$14.99

Incident Management Policy & Procedure Template

Incident Management Policy & Procedure Template

$9.99

Plant & Equipment Maintenance Policy & Procedure Template

Plant & Equipment Maintenance Policy & Procedure Template

$14.99

First Aid Policy Template

First Aid Policy Template

$6.99

Heat Stress Policy Template

Heat Stress Policy Template

$6.99

Confined Spaces Bundle

Confined Spaces Bundle

$59.99

General Construction SWMS Bundle

General Construction SWMS Bundle

$760.00

Save with bundles

Buying more than two? Bundle it.

Compare all bundles
Policies & Procedures Bundle

Policies & Procedures Bundle

39 documents · save 31% on buying them separately

$250.00

Confined Spaces Bundle

Confined Spaces Bundle

5 documents · save 22% on buying them separately

$59.99

General Construction SWMS Bundle

General Construction SWMS Bundle

26 SWMS · save 37% on buying them separately

$760.00

Safety documents for roofing work in Queensland
Roofing is a trade where falls decide everything. Section 291 of the Work Health and Safety Regulation 2011 (Qld) makes construction work high risk if it involves a risk of falling more than 2 m or disturbs or is likely to disturb asbestos, so a SWMS is required before it starts (section 299). If a SWMS for a fall of more than 2 m relies only on administrative controls or PPE, it must describe all the control measures considered (section 299(4)).
Roof falls and edge protection
Queensland has specific fall rules for construction work in sections 306B to 306J. Section 306D applies to roof work on a slope over 26 degrees and wherever a person could fall at least 3 m (housing construction work) or 2 m (other construction work). It requires controls that prevent a fall (such as edge protection or a travel restraint system) or, if that is not practicable, arrest it. Section 306C applies to falls below those heights and to roof work on a slope not over 26 degrees, and requires you to identify fall hazards, assess the risk and use controls; its examples include a brittle roof. Edge protection must be erected following the manufacturer’s or supplier’s instructions or, if there are none, those of an engineer or competent person, and in general its top rail must be at least 900 mm above the surface (section 306E).
Older roof sheeting may contain asbestos. A business that commissions asbestos removal must use a licensed asbestos removalist, with limited exceptions such as 10 square metres or less of non-friable asbestos (section 458). Removing more than 10 square metres of non-friable asbestos needs a class B or class A licence (section 487).
Popular roofing templates

Working at Heights SWMS
Scaffolding SWMS
Elevated Work Platform SWMS
Hot Works SWMS
Cordless Power Tools SWMS
Lifting Gear & Inspection Register

Each one helps you meet your duties once you fill it in for your job. Read our guides to fall protection and asbestos registers. Every template is an editable Word or Excel file you can brand with your logo, and you download it straight after checkout.
Save with a bundle
Need several? Our trade bundles group the SWMS a job usually needs and save up to 37% on buying them separately.