Safety store

Earthmoving SWMS & WHS templates

SWMS, policies, forms and registers for earthmoving work in Queensland. Every template is an editable Word or Excel file you can brand as your own.

Can't find your task?

Tell us what you need. Popular requests get written and added to the store.

Request a template
Electrical Equipment SWMS

Electrical Equipment SWMS

$39.99

Rigging & Dogging SWMS

Rigging & Dogging SWMS

$79.99

Heat Stress & Working Outdoors SWMS

Heat Stress & Working Outdoors SWMS

$39.99

Confined Space Risk Assessment

Confined Space Risk Assessment

$9.99

Electrical Safety Policy & Procedure Template

Electrical Safety Policy & Procedure Template

$9.99

Cordless Power Tools SWMS

Cordless Power Tools SWMS

$39.99

Fitness For Work Policy Template

Fitness For Work Policy Template

$6.99

Water Blaster SWMS

Water Blaster SWMS

$39.99

Environmental Policy Template

Environmental Policy Template

$6.99

Confined Space Entry Permit

Confined Space Entry Permit

$9.99

WHS Manual Template

WHS Manual Template

$650.00

Non-Powered Hand Tools SWMS

Non-Powered Hand Tools SWMS

$39.99

Incident Management Policy & Procedure Template

Incident Management Policy & Procedure Template

$9.99

Emergency Management Policy & Procedure Template

Emergency Management Policy & Procedure Template

$14.99

Plant & Equipment Maintenance Policy & Procedure Template

Plant & Equipment Maintenance Policy & Procedure Template

$14.99

First Aid Policy Template

First Aid Policy Template

$6.99

Heat Stress Policy Template

Heat Stress Policy Template

$6.99

General Construction SWMS Bundle

General Construction SWMS Bundle

$760.00

Hazardous Substances Policy & Procedure Template

Hazardous Substances Policy & Procedure Template

$6.99

Manual Handling Policy & Procedure Template

Manual Handling Policy & Procedure Template

$14.99

Workplace & Sexual Harassment Policy & Procedure Template

Workplace & Sexual Harassment Policy & Procedure Template

$14.99

Personal Protective Equipment Policy Template

Personal Protective Equipment Policy Template

$6.99

Smoking, Drug & Alcohol Policy Template

Smoking, Drug & Alcohol Policy Template

$6.99

JSEA Documents Bundle

JSEA Documents Bundle

$21.99

Save with bundles

Buying more than two? Bundle it.

Compare all bundles
Policies & Procedures Bundle

Policies & Procedures Bundle

39 documents · save 31% on buying them separately

$250.00

Confined Spaces Bundle

Confined Spaces Bundle

5 documents · save 22% on buying them separately

$59.99

General Construction SWMS Bundle

General Construction SWMS Bundle

26 SWMS · save 37% on buying them separately

$760.00

Safety documents for earthmoving work in Queensland
Earthmoving puts trenches, heavy mobile plant, buried services and overhead lines on the same site. Work connected with an excavation is construction work (s 289(2)(f)), and a SWMS must be in place before high risk construction work starts (s 299). Items of s 291 that commonly apply include work in or near a trench or shaft deeper than 1.5 m (g), on or near energised electrical installations or services (k), and in areas where powered mobile plant moves (o).
Rules that come up in earthmoving work
Underground services: before excavation starts, the person with management or control of the workplace must take all reasonable steps to get current underground essential services information and give it to anyone they engage to do the excavation work (s 304).Trenches: for a trench at least 1.5 m deep, the work area must be secured against unauthorised access so far as is reasonably practicable, and all sides must be supported by shoring, benching or battering unless a geotechnical engineer gives written advice that the sides are safe from collapse (s 306).Mobile plant: manage the risks of overturning, operator ejection, things falling on the operator and collisions (s 214). Plant must not collide with pedestrians or other plant, with a warning device where a collision is possible (s 215).Electric lines: the Electrical Safety Regulation covers overhead lines (s 13) and underground lines (ss 14 and 15), including risk assessments where work risks contact.
Templates for earthmoving work
Excavator SWMS: for excavator digging, loading and travelFront-End Loader SWMS: for front-end loader workChain Trencher SWMS: for trenching with a chain trencherRigging & Dogging SWMS: where loads are slung from plantLifting Gear & Inspection Register: for slings and lifting gearPlant Risk Assessment Form: for a hazard check of each item of plant
Every template is an editable Word or Excel file you can brand with your logo, and you download it straight after checkout. Once filled in for your job, the documents help you meet your duties. Related reading: 7 steps to safe excavation and Dial Before You Dig in Queensland. This is general information, not legal advice.
Save with a bundle
Need several? Our trade bundles group the SWMS a job usually needs and save up to 37% on buying them separately.