Safety store

Plant and Equipment SWMS & WHS templates

SWMS, policies, forms and registers for plant and equipment work in Queensland. Every template is an editable Word or Excel file you can brand as your own.

Can't find your task?

Tell us what you need. Popular requests get written and added to the store.

Request a template
Equipment Isolation Policy & Procedure Template

Equipment Isolation Policy & Procedure Template

$14.99

Vehicle & Equipment Policy & Procedure Template

Vehicle & Equipment Policy & Procedure Template

$6.99

Safety Committee Meeting Form Template

Safety Committee Meeting Form Template

$5.99

Safe Operation of Stick Welders SWMS

Safe Operation of Stick Welders SWMS

$39.99

Rattle Gun SWMS

Rattle Gun SWMS

$39.99

Machine Guarding Toolbox Meeting Template

Machine Guarding Toolbox Meeting Template

$4.99

Slew Cranes SWMS Bundle

Slew Cranes SWMS Bundle

$240.00

Risk Management Policy & Procedure

Risk Management Policy & Procedure

$9.99

Transport & Storage Policy & Procedure Template

Transport & Storage Policy & Procedure Template

$9.99

Save with bundles

Buying more than two? Bundle it.

Compare all bundles
Policies & Procedures Bundle

Policies & Procedures Bundle

39 documents · save 31% on buying them separately

$250.00

Confined Spaces Bundle

Confined Spaces Bundle

5 documents · save 22% on buying them separately

$59.99

General Construction SWMS Bundle

General Construction SWMS Bundle

26 SWMS · save 37% on buying them separately

$760.00

Safety documents for plant and equipment in Queensland
The person with management or control of plant at a workplace must manage risks to health and safety (section 203 of the Work Health and Safety Regulation 2011 (Qld)). For powered mobile plant that includes the risks of the plant overturning, things falling on the operator, the operator being ejected and collisions (s 214). A competent person must carry out maintenance, inspection and, if necessary, testing (s 213), and the plant designs and items listed in Schedule 5 must be registered (ss 243 and 246).
Operating a tower crane, a slewing mobile crane, a non-slewing mobile crane with a capacity over 3 t, a vehicle loading crane of 10 metre tonnes or more, a forklift truck, a concrete placing boom, or a boom-type EWP with a boom of 11 m or more needs a high risk work licence (s 81, Schedule 3), and you must see written evidence of it before directing or allowing a worker to do the work (s 85). Dogging, rigging and other crane types have their own classes.
Construction work in an area where powered mobile plant is moving is high risk construction work (section 291(o) of the Work Health and Safety Regulation 2011 (Qld)), so a SWMS is required before it starts (section 299).
Templates to start with

Plant Risk Assessment Form: assess each machine before use
Lifting Gear & Inspection Register: free register for lifting gear
Plant & Equipment Maintenance Policy & Procedure Template: set your maintenance routine
Safe Operation of Forklift SWMS: forklift tasks
Excavator SWMS: earthmoving
Rigging & Dogging SWMS: lifting and slinging

Related guides: plant hazard risk assessments and inspecting lifting gear.
Every template is an editable Word (or Excel) file: add your logo and download straight after checkout. Filled in for your job, they help you meet your duties.
Save with a bundle
Need several? Our trade bundles group the SWMS a job usually needs and save up to 37% on buying them separately.