Safety store

Concreting SWMS & WHS templates

SWMS, policies, forms and registers for concreting work in Queensland. Every template is an editable Word or Excel file you can brand as your own.

Can't find your task?

Tell us what you need. Popular requests get written and added to the store.

Request a template
Hazardous Chemical or Substance SWMS

Hazardous Chemical or Substance SWMS

$49.99

Electrical Equipment SWMS

Electrical Equipment SWMS

$39.99

Heat Stress & Working Outdoors SWMS

Heat Stress & Working Outdoors SWMS

$39.99

Concrete Saw SWMS

Concrete Saw SWMS

$39.99

Confined Space Risk Assessment

Confined Space Risk Assessment

$9.99

Silica Dust SWMS Template

Silica Dust SWMS Template

$59.99

Grinder Operation SWMS

Grinder Operation SWMS

$39.99

Electrical Safety Policy & Procedure Template

Electrical Safety Policy & Procedure Template

$9.99

Cordless Power Tools SWMS

Cordless Power Tools SWMS

$39.99

Fitness For Work Policy Template

Fitness For Work Policy Template

$6.99

Water Blaster SWMS

Water Blaster SWMS

$39.99

Environmental Policy Template

Environmental Policy Template

$6.99

Confined Space Entry Permit

Confined Space Entry Permit

$9.99

WHS Manual Template

WHS Manual Template

$650.00

Non-Powered Hand Tools SWMS

Non-Powered Hand Tools SWMS

$39.99

Emergency Management Policy & Procedure Template

Emergency Management Policy & Procedure Template

$14.99

Incident Management Policy & Procedure Template

Incident Management Policy & Procedure Template

$9.99

Plant & Equipment Maintenance Policy & Procedure Template

Plant & Equipment Maintenance Policy & Procedure Template

$14.99

First Aid Policy Template

First Aid Policy Template

$6.99

Heat Stress Policy Template

Heat Stress Policy Template

$6.99

Confined Spaces Bundle

Confined Spaces Bundle

$59.99

General Construction SWMS Bundle

General Construction SWMS Bundle

$760.00

Hazardous Substances Policy & Procedure Template

Hazardous Substances Policy & Procedure Template

$6.99

Manual Handling Policy & Procedure Template

Manual Handling Policy & Procedure Template

$14.99

Save with bundles

Buying more than two? Bundle it.

Compare all bundles
Policies & Procedures Bundle

Policies & Procedures Bundle

39 documents · save 31% on buying them separately

$250.00

Confined Spaces Bundle

Confined Spaces Bundle

5 documents · save 22% on buying them separately

$59.99

General Construction SWMS Bundle

General Construction SWMS Bundle

26 SWMS · save 37% on buying them separately

$760.00

Safety documents for concreting work in Queensland
Concreting can bring in several items from section 291 of the Work Health and Safety Regulation 2011 (Qld): tilt-up or precast concrete (m), a risk of falling more than 2 m at slab edges and formwork (a), and areas where powered mobile plant such as trucks and pumps is moving (o). Construction work involving any of these needs a SWMS before it starts (section 299). Under Schedule 3, rigging tilt slabs falls in the intermediate rigging class of high risk work licence, and concrete placing booms have their own licence class.
Silica dust
Cutting, grinding or drilling concrete with a power tool can release respirable crystalline silica. Chapter 8A covers processing a crystalline silica substance, meaning material that contains at least 1% crystalline silica. Processing must be controlled (s 529C): use at least one control such as wet dust suppression, on-tool extraction or local exhaust ventilation, and give respiratory protective equipment to anyone still at risk (s 529B). Before processing starts you assess whether it is reasonably likely to risk anyone’s health and record that in writing (s 529CA). High risk processing needs a silica risk control plan (s 529CB), which a SWMS can stand in for if the processing is also high risk construction work and the SWMS covers the same ground.
Templates to start with

Concreting SWMS Template: pours, screeding and finishing
Silica Dust SWMS Template: dust controls and respirators
Concrete Saw SWMS: slab and wall sawing
Concrete Grinder SWMS Template: grinding and surface prep
Concrete Core Drilling SWMS Template: coring through slabs
Concrete Pumping SWMS Template: pump and boom set-up

Related guides: the dangers of silica dust and conducting concrete work safely.
Each one is an editable Word file: add your logo and download it straight after checkout. Filled in for your job, they help you meet your duties.
Save with a bundle
Need several? Our trade bundles group the SWMS a job usually needs and save up to 37% on buying them separately.