Skip to content

Driven Pile Installation SWMS

Driven pile installation in Queensland: hammer rigs, pile handling and lifting, exclusion zones, noise, services and splicing. An editable Word SWMS template.

RG

Written by Ryan Graham, health and safety professional (16 years on Queensland sites)

$49.99 incl. GST

AUD · one-off purchase · instant download

  • Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
  • Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
  • Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
  • Secure checkout · card, Apple Pay or Google Pay through Stripe

About this template

Suits piling contractors and builders who drive precast concrete, steel or timber piles with hammer rigs. It follows the work from planning and services checks through delivery, pitching, driving, splicing and demobilisation.

One item is ticked for you: movement of powered mobile plant, because the piling rig, crane and trucks work in the area (WHS Regulation s 291), so a SWMS is required before the work starts (s 299). Add the energised electrical installations or services item if the piling is near overhead lines or underground cables, the precast concrete item if you drive precast concrete piles, and any other item that applies, such as a fall of more than 2 metres.

New to SWMS? Read What Is A Safe Work Method Statement?

What Is Covered In Our Driven Pile Installation SWMS?

After the standard pre-start checks, the job steps run from “Plan the piling and set the exclusion zones” to “Complete the pile and demobilise”. The hazards and controls include:

  • Underground services strikes and overhead power lines
  • Rig overturn on a poor working platform
  • Piles falling during unloading and pitching
  • Crush and pinch points on the rig and leaders
  • Falling hammer and parts thrown from the pile head
  • Hammer noise and hearing loss
  • Hose whip and fuel fires on diesel hammers
  • Pile breakage, buckling and refusal
  • Hot work when splicing steel piles
  • Exclusion zones and loads over people
  • Exposed pile heads and trips
  • Rig loading and unloading on floats

High Risk Construction Work

These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:

  • Is carried out in an area at a workplace in which there is any movement of powered mobile plant

Licences, Training and Competency

  • General construction induction training card (white card) for construction work
  • No high risk work licence class applies to operating a hammer piling rig by itself (Schedule 3 names no piling class); a crane licence class applies if the rig is a crane or a crane lifts the piles
  • Rig operator trained and verified competent on the make and model of rig, hammer and leaders in use, with the maker’s manual on the rig
  • High risk work licence in the dogging class, or a higher rigging class (Schedule 3), for anyone who slings a load or directs the plant operator in moving a load when the load is out of the operator’s view (Schedule 19, dogging work)
  • High risk work licence for the class of any crane used to unload or pitch piles (Schedule 3)
  • Competent person (geotechnical or piling engineer) to certify the working platform
  • Trained operator for the cable and pipe locator
  • Spotter briefed on hand signals, the exclusion zone and overhead line clearances
  • Workers trained in hot work where piles are spliced by welding
  • Site induction

Legislation and Codes of Practice Referenced

  • Work Health and Safety Act 2011 (Qld)
  • Work Health and Safety Regulation 2011 (Qld)
  • Excavation Work Code of Practice 2021
  • Managing Risks of Plant in the Workplace Code of Practice 2021
  • Mobile Crane Code of Practice 2024 (lifting piles)
  • Managing Noise and Preventing Hearing Loss at Work Code of Practice 2021
  • Hazardous Manual Tasks Code of Practice 2021
  • Welding Processes Code of Practice 2021
  • Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements Code of Practice 2022
  • Managing Risks of Hazardous Chemicals in the Workplace Code of Practice 2021
  • Safe Design of Structures Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • First Aid in the Workplace Code of Practice 2021
  • Traffic Management for Construction or Maintenance Work Code of Practice 2008 (truck movements beside a road)
  • Electrical Safety Act 2002 (Qld)
  • Electrical Safety Regulation 2026 (Qld): overhead line exclusion zones and unsafe distances (ss 10, 11 and 13 and sch 2) and underground electric lines (ss 14 and 15)
  • Electrical Safety Code of Practice 2020 – Working near overhead and underground electric lines

What You Get

  • An editable Microsoft Word document (13 A4 landscape pages). Type your business, client and job details once and they fill in on every page, with a space for your logo
  • 10 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
  • PPE listed for this job: safety boots; high-visibility clothing; hard hat; safety glasses
  • Emergency arrangements for: power line contact, rig overturn or pile fall and damaged gas, fuel or electrical service
  • Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)

Adjust it for your site, plant and crew, and talk it through with your workers before work starts. Please make sure you read our Disclaimer before downloading this SWMS.

Checked against the Queensland laws and codes of practice listed above. Last reviewed November 2026.

Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.

How to use it

From download to site in three steps

Buy and download

Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.

Make it yours

Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.

Brief your crew

Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.

FAQ

Before you buy

Something else? Ask us and a real person will reply.

What format is it?

Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.

How do I get it after I pay?

Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.

Is it compliant with Queensland law?

It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.

What if it isn't right for my job?

If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.

Reviews

Only logged in customers who have purchased this product may leave a review.

More templates like this