Skip to content

Temporary Concrete Barrier Placement SWMS

Placing temporary concrete barriers by crane or loader in Queensland, covering crush, rigging and live traffic. An editable Word SWMS template for Queensland.

RG

Written by Ryan Graham, health and safety professional (16 years on Queensland sites)

$49.99 incl. GST

AUD · one-off purchase · instant download

  • Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
  • Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
  • Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
  • Secure checkout · card, Apple Pay or Google Pay through Stripe

About this template

Suits civil, road and traffic crews who unload, place, connect and remove temporary concrete barriers on or beside a road. It covers lift planning, unloading, setting and connecting barriers, working beside live traffic and removal. Traffic control set-up needs a separate SWMS.

Work involving precast concrete, work on, in or adjacent to a road in use by traffic, and work where powered mobile plant moves are high risk construction work (WHS Regulation s 291(m), (n) and (o)), so those items are ticked. Untick the precast item if your barriers are not concrete, for example water-filled plastic barriers. Also tick any other item the job involves, such as energised electrical services, or the shaft or trench item if pins or footings need an excavation deeper than 1.5 metres.

New to SWMS? Read What Is A Safe Work Method Statement?

What Is Covered In Our Temporary Concrete Barrier Placement SWMS?

After the standard pre-start checks, the job steps run from “Plan the barrier layout, lifts and traffic arrangements” to “Check the barrier line and hand over”. The hazards and controls include:

  • Barrier dropped or swinging during the lift
  • Crush between barriers or against vehicles
  • Failure of lifting points and lifting gear
  • Crane or loader overturning
  • Vehicles striking workers beside the road
  • Delivery trucks and plant reversing
  • Contact with overhead power lines
  • Striking underground services when pinning
  • Pinched hands when fitting connections
  • Manual handling of connectors and end parts
  • Fatigue, heat and night work on the road
  • Gaps or wrong end treatments left after placement

High Risk Construction Work

These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:

  • Involves tilt-up or precast concrete
  • Is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians
  • Is carried out in an area at a workplace in which there is any movement of powered mobile plant

Licences, Training and Competency

  • General construction induction training card (white card) for construction work on or beside a road
  • Working in Proximity to Traffic training for all workers on or next to a road, as the Traffic Management for Construction or Maintenance Work Code of Practice 2008 recommends
  • High risk work licence for the class of crane used (Schedule 3), for example vehicle loading crane (10 metre tonnes or more), non-slewing mobile crane or slewing mobile crane
  • High risk work licence in the dogging class, or a higher rigging class (Schedule 3), for anyone who slings a barrier or directs the operator when the load is out of view (Schedule 19, dogging work)
  • Operator trained and assessed as competent on the loader, telehandler or barrier handling attachment used (no high risk work licence class applies to these in general)
  • Current driver licence for the class of truck driven
  • Queensland traffic controller accreditation for anyone who directs traffic; this is covered by a separate SWMS, not this one
  • Site induction and a briefing on the approved traffic management plan

Legislation and Codes of Practice Referenced

  • Work Health and Safety Act 2011 (Qld)
  • Work Health and Safety Regulation 2011 (Qld)
  • Work Health and Safety Regulation 2011 (Qld): ss 214 and 215 (powered mobile plant)
  • Work Health and Safety Regulation 2011 (Qld): s 219 (plant that lifts or suspends loads)
  • Work Health and Safety Regulation 2011 (Qld): s 315 (principal contractor: traffic in the vicinity of the workplace)
  • Traffic Management for Construction or Maintenance Work Code of Practice 2008
  • Manual of Uniform Traffic Control Devices Part 3 (MUTCD Part 3)
  • AS/NZS 3845 Road safety barrier systems and devices (named in the Traffic Management for Construction or Maintenance Work Code of Practice 2008)
  • Transport Operations (Road Use Management – Accreditation and Other Provisions) Regulation 2015 (Qld): traffic controllers, sections 51 to 55
  • Managing Risks of Plant in the Workplace Code of Practice 2021
  • Mobile Crane Code of Practice 2024 (where a crane lifts barriers)
  • Tilt-up and Pre-cast Construction Industry Code of Practice 2003
  • Hazardous Manual Tasks Code of Practice 2021
  • Managing Noise and Preventing Hearing Loss at Work Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • First Aid in the Workplace Code of Practice 2021
  • Safe Work Australia model Code of Practice: Managing the risk of fatigue at work (guidance)
  • Electrical Safety Act 2002 (Qld)
  • Electrical Safety Regulation 2026 (Qld): ss 10 to 13 and sch 2 (overhead power line exclusion zones), ss 14 and 15 (underground electric lines)

What You Get

  • An editable Microsoft Word document (13 A4 landscape pages). Type your business, client and job details once and they fill in on every page, with a space for your logo
  • 9 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
  • PPE listed for this job: safety boots with toe protection; high-visibility clothing of the class the traffic management plan requires, with retroreflective material for night work; hard hat; safety glasses
  • Emergency arrangements for: vehicle strikes the work zone or a worker, barrier dropped or person crushed and power line contact
  • Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)

Adjust it for your site, plant and crew, and talk it through with your workers before work starts. Please make sure you read our Disclaimer before downloading this SWMS.

Checked against the Queensland laws and codes of practice listed above. Last reviewed November 2026.

Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.

How to use it

From download to site in three steps

Buy and download

Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.

Make it yours

Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.

Brief your crew

Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.

FAQ

Before you buy

Something else? Ask us and a real person will reply.

What format is it?

Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.

How do I get it after I pay?

Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.

Is it compliant with Queensland law?

It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.

What if it isn't right for my job?

If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.

Reviews

Only logged in customers who have purchased this product may leave a review.

More templates like this