Skip to content

Steel Sheet Piling Installation SWMS

Steel sheet pile installation in Queensland: vibratory hammers on excavators, rigging, noise, vibration and underground services. An editable Word SWMS template.

RG

Written by Ryan Graham, health and safety professional (16 years on Queensland sites)

$49.99 incl. GST

AUD · one-off purchase · instant download

  • Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
  • Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
  • Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
  • Secure checkout · card, Apple Pay or Google Pay through Stripe

About this template

Suits piling and civil contractors who install steel sheet piles with vibratory hammers on excavators. It follows the work from the engineer’s design and services checks through pitching, driving, jammed sheets and demobilisation.

Two items are ticked for you: movement of powered mobile plant, because the excavator and trucks work in the area, and work on or near energised services, because sheets are driven into ground that may hold underground cables and near overhead lines (WHS Regulation s 291), so a SWMS is required before the work starts (s 299). Add the shaft and trench item if you work beside an excavation deeper than 1.5 metres, the water item if there is a drowning risk, and any other item that applies.

New to SWMS? Read What Is A Safe Work Method Statement?

What Is Covered In Our Steel Sheet Piling Installation SWMS?

After the standard pre-start checks, the job steps run from “Plan the sheet piling and set the exclusion zones” to “Finish the wall and demobilise”. The hazards and controls include:

  • Underground services and overhead power lines
  • Excavator instability on the working platform
  • Sheets falling from stacks and during pitching
  • Hydraulic hose failure and oil injection
  • Vibratory hammer noise and hearing loss
  • Ground vibration near structures and services
  • Pinch and crush points at clamps and interlocks
  • Cuts from sheet edges
  • Falls into excavations and water beside the wall
  • Jammed sheets and extraction
  • Loads over people and dogging
  • Plant loading and unloading

High Risk Construction Work

These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:

  • Is carried out on or near energised electrical installations or services
  • Is carried out in an area at a workplace in which there is any movement of powered mobile plant

Licences, Training and Competency

  • General construction induction training card (white card) for construction work
  • No high risk work licence class applies to operating an excavator or a vibratory hammer (Schedule 3 names no piling class); the crane class applies only if a crane lifts the sheets
  • Operator trained and verified competent on the excavator, quick hitch and vibratory hammer used
  • High risk work licence in the dogging class, or a higher rigging class (Schedule 3), for anyone who slings a load or directs the plant operator in moving a load when the load is out of the operator’s view (Schedule 19, dogging work)
  • High risk work licence for the class of any crane used to unload or pitch sheets (Schedule 3)
  • Competent person (engineer) to confirm the design, the platform and any vibration limits
  • Trained operator for the cable and pipe locator
  • Spotter briefed on hand signals, the exclusion zone and overhead line clearances
  • Site induction

Legislation and Codes of Practice Referenced

  • Work Health and Safety Act 2011 (Qld)
  • Work Health and Safety Regulation 2011 (Qld)
  • Excavation Work Code of Practice 2021 (steel sheet piling and shoring)
  • Managing Risks of Plant in the Workplace Code of Practice 2021
  • Managing Noise and Preventing Hearing Loss at Work Code of Practice 2021
  • Hazardous Manual Tasks Code of Practice 2021
  • Mobile Crane Code of Practice 2024 (earthmoving plant used as a crane)
  • Welding Processes Code of Practice 2021
  • Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements Code of Practice 2022
  • Managing Risks of Hazardous Chemicals in the Workplace Code of Practice 2021
  • Safe Design of Structures Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • First Aid in the Workplace Code of Practice 2021
  • Traffic Management for Construction or Maintenance Work Code of Practice 2008 (work beside a road)
  • Electrical Safety Act 2002 (Qld)
  • Electrical Safety Regulation 2026 (Qld): overhead line exclusion zones and unsafe distances (ss 10, 11 and 13 and sch 2) and underground electric lines (ss 14 and 15)
  • Electrical Safety Code of Practice 2020 – Working near overhead and underground electric lines

What You Get

  • An editable Microsoft Word document (13 A4 landscape pages). Type your business, client and job details once and they fill in on every page, with a space for your logo
  • 10 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
  • PPE listed for this job: safety boots; high-visibility clothing; hard hat; safety glasses
  • Emergency arrangements for: power line contact, machine overturn or wall movement and hydraulic oil injection injury
  • Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)

Adjust it for your site, plant and crew, and talk it through with your workers before work starts. Please make sure you read our Disclaimer before downloading this SWMS.

Checked against the Queensland laws and codes of practice listed above. Last reviewed November 2026.

Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.

How to use it

From download to site in three steps

Buy and download

Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.

Make it yours

Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.

Brief your crew

Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.

FAQ

Before you buy

Something else? Ask us and a real person will reply.

What format is it?

Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.

How do I get it after I pay?

Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.

Is it compliant with Queensland law?

It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.

What if it isn't right for my job?

If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.

Reviews

Only logged in customers who have purchased this product may leave a review.

More templates like this