
Crawler Crane SWMS
Operating crawler cranes on Queensland sites: ground bearing, mats, travel on slopes, tip-over, load charts, overhead lines and slinging. An editable Word SWMS template.
RG
Written by Ryan Graham, health and safety professional (16 years on Queensland sites)
$49.99 incl. GST
AUD · one-off purchase · instant download
- Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
- Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
- Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
- Secure checkout · card, Apple Pay or Google Pay through Stripe
About this template
For crane companies, civil and building contractors and principal contractors who use crawler cranes for lifting on site. It follows the job from lift planning and the pre-start check through ground and mat set-up, power line checks, travel, slinging, lifting and wind to counterweight changes and shut-down. Pick-and-carry, wheeled slewing and tower cranes have their own SWMS, and assembling or dismantling the crane, multiple crane lifts, lifting people in work boxes, tilt-up and precast panels, bridge beams and loads of 50 t or more are outside this one.
Using a crawler crane on construction work is high risk construction work when the crane or other powered mobile plant moves in the work area (WHS Regulation ss 289 and 291(o)), so powered mobile plant is ticked and a SWMS is required before the work starts (s 299); away from construction work this document works as a written safe work procedure or task risk assessment. You can also tick energised electrical installations near overhead lines, a fall of more than 2 metres, a road or traffic corridor, a trench deeper than 1.5 metres nearby and tilt-up or precast concrete when the job involves them.
New to SWMS? Read What is a safe work method statement?
What is covered in our crawler crane SWMS?
After the standard pre-start checks, the job steps run from “Plan the lift and check the crane’s configuration” to “Shut down, secure and refuel”. The hazards and controls include:
- Ground failing under the tracks or mats
- Crane tip-over forwards, backwards or sideways
- Travel on slopes with and without a load
- Contact with overhead power lines
- Overloading beyond the load chart
- Limiter set for the wrong configuration
- Wind on the boom and load
- Slung loads slipping or dropping
- Loads swinging over people
- Counterweight tail swing crushing people
- Cranes working beside excavations and buried services
- Falls from the tracks, deck and boom
- Free-fall winches and two-blocking
- Unattended cranes started or left unsafe
High risk construction work
These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:
- Is carried out in an area at a workplace in which there is any movement of powered mobile plant
Licences, training and competency
- High risk work licence in the slewing mobile crane class that matches the crane’s capacity (Schedule 3 of the WHS Regulation: slewing mobile crane with a capacity up to 20t, item 15; up to 60t, item 16; up to 100t, item 17; over 100t, item 18); a crawler crane is a mobile crane (Schedule 19) with a boom that can be slewed
- High risk work licence in the dogging class, or a higher rigging class (Schedule 3 items 4 to 7), for anyone who slings a load or directs a plant operator in the movement of a load when the load is out of the operator’s view (Schedule 19, dogging work); the approved Mobile Crane Code of Practice 2024 recommends that the operator does not sling their own load, even if the operator also holds a dogging licence
- Intermediate rigging licence (Schedule 3 item 6, which lists dual lifts) or advanced rigging licence (item 7) for the person who directs a dual or multiple crane lift, which also needs its own documented lifting procedure and is outside this SWMS
- Assembling and dismantling the crane are outside this SWMS: a competent person such as a rigger does them to the maker’s procedure under a separate SWMS (a rigger with the qualifying rigging licence who only sets up or dismantles the crane does not need the crane operator class, WHS Regulation s 82(4))
- Familiarisation training on the crane model before first use (controls, load charts, limit set-up, rope falls, track and counterweight attachment), recorded and signed; refresher training for operators, doggers and riggers at least every three years is recommended by the approved Mobile Crane Code of Practice 2024
- Trained safety observer (spotter) where the crane works near overhead power lines; the observer does no other task, including dogging
- Geotechnical engineer to certify ground bearing capacity for heavy lifts, and an engineer to set a lower wind limit for loads with a large surface area
- Written evidence of each high risk work licence sighted and recorded before the work starts (WHS Regulation s 85)
- General construction induction training card (white card) for construction work, and site induction
Legislation and codes of practice referenced
- Work Health and Safety Act 2011 (Qld)
- Work Health and Safety Regulation 2011 (Qld)
- Mobile Crane Code of Practice 2024
- Managing Risks of Plant in the Workplace Code of Practice 2021
- Managing the Risk of Falls at Workplaces Code of Practice 2021
- Excavation Work Code of Practice 2021 (plant near excavations)
- Hazardous Manual Tasks Code of Practice 2021
- Managing Noise and Preventing Hearing Loss at Work Code of Practice 2021
- Managing the Work Environment and Facilities Code of Practice 2021
- How to Manage Work Health and Safety Risks Code of Practice 2021
- Traffic Management for Construction or Maintenance Work Code of Practice 2008 (work on or beside a road)
- Tilt-up and Pre-cast Construction Industry Code of Practice 2003 (panel lifts, which need their own lifting procedure)
- Electrical Safety Act 2002 (Qld)
- Electrical Safety Regulation 2026 (Qld): overhead electric line exclusion zones, Schedule 2
- Electrical Safety Code of Practice 2020 – Working near overhead and underground electric lines (distances come from the 2026 Regulation)
- Safe Work Australia model Code of Practice: Elevating work platforms (guidance); its power line contact advice is applied by analogy
What you get
- An editable Microsoft Word document (20 pages), laid out on A4 landscape pages. Type your business, client and job details once and they fill in on every page, with a space for your logo
- 10 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
- PPE listed for this job: safety boots; high-visibility long-sleeve clothing; hard hat when outside the cab; safety glasses
- Emergency arrangements for: contact with an overhead power line, overturned crane, boom or structural failure or dropped load and crane bogged, settling or tilting
- Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)
Adjust it for your site, plant and crew, and talk it through with your workers before work starts.
Checked against the Queensland laws and codes of practice listed above. Last reviewed November 2026.
Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.
How to use it
From download to site in three steps
Buy and download
Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.
Make it yours
Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.
Brief your crew
Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.
What format is it?
Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.
How do I get it after I pay?
Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.
Is it compliant with Queensland law?
It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.
What if it isn't right for my job?
If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.
Only logged in customers who have purchased this product may leave a review.
More templates like this



Overhead Crane SWMS
$39.99




Reviews