Skip to content

WHS Risk Register

Editable Excel WHS risk register template for Queensland: score each risk from 1 to 25, record controls in the WHS Regulation s 36 order, and track residual risk, owners and review dates.

RG

Written by Ryan Graham, health and safety professional (16 years on Queensland sites)

$9.99 incl. GST

AUD · one-off purchase · instant download

  • Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
  • Make it yours in minutes · edit in Microsoft Excel and add your logo
  • Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
  • Secure checkout · card, Apple Pay or Google Pay through Stripe

About this template

A WHS risk register template in Excel for Queensland businesses that want to hold, score, control and review the risks on their risk profile. Each row is one risk: what could happen, who is exposed, the controls in place, an initial likelihood and consequence score, further controls in the order set by WHS Regulation s 36, a check that the control works, and a residual score. Next review dates are worked out from the rating, and overdue and triggered reviews turn red. The Summary, Heat Map and Top Ten Risks sheets show where the risk sits. Use the Free Hazard Register Template to log hazards as people report them, and use this register to manage the risks that matter.

What Is Included In Our WHS Risk Register?

  • A Start Here sheet: type your details once and they appear on every sheet and printed page
  • One row for each risk, with the hazard, task, what could happen, who is exposed and the controls now in place
  • Initial and residual scoring on the 5 by 5 matrix (consequence 1 to 5 times likelihood 1 to 5) with the band worked out and colour coded
  • A control tier for each further control in the order of WHS Regulation s 36, with owner, due date and status
  • A control check column for the WHS Regulation s 37 test: fit for purpose, installed and used correctly
  • Next review date worked out from the current rating, with review intervals you can change
  • A review trigger list carrying the WHS Regulation s 38 circumstances, so a triggered risk shows Review now
  • Consultation columns (who and when) and a link to the SWMS or procedure for the risk
  • Summary sheet counting risks by band, controls overdue, controls not effective and reviews overdue
  • A heat map of risks before and after controls, a top ten list of the highest current scores and a Matrix Guide sheet

Legislation and Codes of Practice Referenced

  • Work Health and Safety Act 2011 (Qld): ss 18, 47, 49
  • Work Health and Safety Regulation 2011 (Qld): ss 34 to 38, 299
  • How to Manage Work Health and Safety Risks Code of Practice 2021

What You Get

  • An editable Microsoft Excel workbook with no macros
  • Drop-down lists, frozen headings, working formulas and colour highlighting
  • Room for 200 risks, with more rows when you need them
  • Print-ready pages with your business details repeated on every printed page
  • Drop-down options you can change on the Lists sheet to suit your business

Review it and adjust it to suit your business, your sites and the way your team works, and talk it through with your workers. If you have any trouble downloading this template, you can contact us at any time. Please make sure you read our Disclaimer before downloading.

Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.

How to use it

From download to site in three steps

Buy and download

Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.

Make it yours

Open it in Microsoft Word or Excel. Add your logo, business details, site and job information, and adjust it to how the work is done.

Brief your crew

Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.

FAQ

Before you buy

Something else? Ask us and a real person will reply.

What format is it?

Microsoft Excel. Edit it in Excel, or free in Excel for the web, and add your own logo and business details.

How do I get it after I pay?

Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.

Is it compliant with Queensland law?

It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.

What if it isn't right for my job?

If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.

Reviews

Only logged in customers who have purchased this product may leave a review.

More templates like this