Skip to content

Site Shed and Amenities Placement SWMS

Placing site sheds, containers and amenity units by crane or truck in Queensland: rigging, ground bearing, services and manual handling. An editable Word SWMS template.

RG

Written by Ryan Graham, health and safety professional (16 years on Queensland sites)

$49.99 incl. GST

AUD · one-off purchase · instant download

  • Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
  • Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
  • Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
  • Secure checkout · card, Apple Pay or Google Pay through Stripe

About this template

For builders, site managers, hire companies and transport contractors who deliver and place site sheds, containers, toilets and crib rooms on construction sites. It follows the job from planning the lift and preparing the ground through delivery, rigging, lifting and setting down to connecting services and removal, and points to a separate SWMS for the crane operation itself.

Ticked for you: work in an area where powered mobile plant moves (reg 291(o)), because a crane or truck is on site for every placement. Also tick, where they apply to your job: a fall of more than 2 m if anyone works on top of the unit (reg 291(a)), work near energised overhead lines or electrical services (reg 291(k)), a trench or shaft deeper than 1.5 m if you dig for a footing (reg 291(g)(i)), and work on, in or beside a road in use by traffic (reg 291(n)).

New to SWMS? Read What Is A Safe Work Method Statement?

What Is Covered In Our Site Shed and Amenities Placement SWMS?

After the standard pre-start checks, the job steps run from “Plan the placement and choose the lifting method” to “Pack up and clear the area”. The hazards and controls include:

  • Crane overturn and overloaded lifts
  • Dropped unit from failed rigging
  • Load swinging or travelling over people
  • Contact with overhead power lines
  • Soft or unstable ground under outriggers
  • Striking underground services
  • Truck and crane movements near pedestrians
  • Falls when slinging from the unit roof
  • Crushed hands and feet when packing and levelling
  • Electric shock from temporary power
  • Wind moving a placed unit
  • Manual handling of packers, mats and steps

High Risk Construction Work

These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:

  • Is carried out in an area at a workplace in which there is any movement of powered mobile plant

Licences, Training and Competency

  • General construction induction training card (white card) for construction work, and site induction
  • High risk work licence for the class of crane used to lift the unit: the mobile crane class that matches the crane, or the vehicle loading crane class for a capacity of 10 metre tonnes or more (Schedule 3)
  • Dogging licence (Schedule 3 item 4) or a higher rigging class for anyone who slings the unit or directs the crane operator when the load is out of the operator’s view (Schedule 19, dogging work)
  • Vehicle loading crane under 10 metre tonnes: operator trained on the make and model, with any slinging that needs judgement done by a licensed dogger or rigger
  • Driver licence for the truck class, with training in the tilt tray, stabilisers and load restraint
  • Licensed electrical worker for connecting temporary power to the unit (Electrical Safety Act 2002 s 55)
  • Licensed plumber or drainer for water and sewer connections to amenity units (Plumbing and Drainage Act 2018 s 56)
  • Engineer’s or geotechnical advice on ground bearing where the ground is soft, filled, sloping or close to an excavation
  • Trained first aider on site

Legislation and Codes of Practice Referenced

  • Work Health and Safety Act 2011 (Qld)
  • Work Health and Safety Regulation 2011 (Qld)
  • Mobile Crane Code of Practice 2024
  • Managing Risks of Plant in the Workplace Code of Practice 2021
  • Hazardous Manual Tasks Code of Practice 2021
  • Managing the Risk of Falls at Workplaces Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021
  • Excavation Work Code of Practice 2021 (where a pad or footing is dug)
  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Plumbing and Drainage Act 2018 (Qld)
  • Electrical Safety Act 2002 (Qld)
  • Electrical Safety Regulation 2026 (Qld): overhead power line exclusion zones in schedule 2
  • Electrical Safety Code of Practice 2020 – Working near overhead and underground electric lines (distances come from the 2026 Regulation)

What You Get

  • An editable Microsoft Word document (14 A4 landscape pages). Type your business, client and job details once and they fill in on every page, with a space for your logo
  • 10 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
  • PPE listed for this job: safety boots; high-visibility clothing; hard hat; safety glasses
  • Emergency arrangements for: load swinging or crane overturning, plant or load touches a power line and crushing injury under the unit
  • Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)

Adjust it for your site, plant and crew, and talk it through with your workers before work starts. Please make sure you read our Disclaimer before downloading this SWMS.

Checked against the Queensland laws and codes of practice listed above. Last reviewed November 2026.

Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.

How to use it

From download to site in three steps

Buy and download

Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.

Make it yours

Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.

Brief your crew

Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.

FAQ

Before you buy

Something else? Ask us and a real person will reply.

What format is it?

Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.

How do I get it after I pay?

Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.

Is it compliant with Queensland law?

It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.

What if it isn't right for my job?

If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.

Reviews

Only logged in customers who have purchased this product may leave a review.

More templates like this