
Precast Box Culvert Installation SWMS
Installing precast box culverts in Queensland, covering crane and excavator lifts, trench collapse, rigging and traffic. An editable Word SWMS template for Queensland.
RG
Written by Ryan Graham, health and safety professional (16 years on Queensland sites)
$49.99 incl. GST
AUD · one-off purchase · instant download
- Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
- Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
- Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
- Secure checkout · card, Apple Pay or Google Pay through Stripe
About this template
Suits civil and drainage contractors who excavate for, lift and join precast box culvert units. It follows the work from lift planning, services and excavation through unloading, setting and jointing the units to backfill and pack-up. Crane operation and precast pits need separate SWMS.
Work involving precast concrete and work where powered mobile plant moves are high risk construction work (WHS Regulation s 291(m) and (o)), so those items are ticked. Also tick the shaft or trench item (s 291(g)(i)) if the excavation is deeper than 1.5 metres, the road item (s 291(n)) if the work is on or beside a road in use, the water item (s 291(q)) if the work is in or beside water with a risk of drowning, and any other item the job involves, such as energised electrical services, a confined space or the contaminated atmosphere item when cutting or core drilling creates silica dust.
Similar job: if it is closer to your work, see the Precast Pit and Manhole Installation SWMS.
New to SWMS? Read What Is A Safe Work Method Statement?
What Is Covered In Our Precast Box Culvert Installation SWMS?
After the standard pre-start checks, the job steps run from “Plan the lifts, access and temporary works” to “Finish the works, reinstate and pack up”. The hazards and controls include:
- Dropped or swinging culvert units
- Crush between a unit and the trench wall
- Trench collapse around the culvert
- Crane or excavator overturning
- Failure of lifting inserts and lifting gear
- Contact with overhead power lines
- Striking underground services
- Falling into the open excavation
- Water and flooding in the excavation
- Traffic and delivery trucks near the works
- Silica dust from cutting and core drilling
- Entering the completed culvert barrel
High Risk Construction Work
These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:
- Involves tilt-up or precast concrete
- Is carried out in an area at a workplace in which there is any movement of powered mobile plant
Licences, Training and Competency
- General construction induction training card (white card) for construction work
- High risk work licence for the class of crane used (Schedule 3), for example slewing mobile, non-slewing mobile or vehicle loading crane (10 metre tonnes or more); no high risk work licence class applies to operating an excavator
- High risk work licence in the dogging class, or a higher rigging class (Schedule 3), for anyone who slings a unit or directs the operator when the load is out of view (Schedule 19, dogging work)
- Excavator operator trained and assessed as competent on the machine and the lifting attachments used
- Competent person to inspect the excavation and shoring before entry and after rain, flow or ground movement
- Trained operator for the cable and pipe locator
- Spotter briefed on hand signals, the exclusion zone and overhead line clearances
- Working in Proximity to Traffic training where the work is on or beside a road
- Site induction
Legislation and Codes of Practice Referenced
- Work Health and Safety Act 2011 (Qld)
- Work Health and Safety Regulation 2011 (Qld)
- Excavation Work Code of Practice 2021
- Managing Risks of Plant in the Workplace Code of Practice 2021
- Mobile Crane Code of Practice 2024
- Tilt-up and Pre-cast Construction Industry Code of Practice 2003
- Confined Spaces Code of Practice 2021
- Hazardous Manual Tasks Code of Practice 2021
- Managing Noise and Preventing Hearing Loss at Work Code of Practice 2021
- Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements Code of Practice 2022
- Traffic Management for Construction or Maintenance Work Code of Practice 2008
- How to Manage Work Health and Safety Risks Code of Practice 2021
- Managing the Work Environment and Facilities Code of Practice 2021
- First Aid in the Workplace Code of Practice 2021
- Electrical Safety Act 2002 (Qld)
- Electrical Safety Regulation 2026 (Qld): exclusion zones for overhead lines (schedule 2) and damage to underground lines (ss 14-15)
- Electrical Safety Code of Practice 2020 – Working near overhead and underground electric lines
What You Get
- An editable Microsoft Word document (14 A4 landscape pages). Type your business, client and job details once and they fill in on every page, with a space for your logo
- 9 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
- PPE listed for this job: safety boots; high-visibility clothing (the class the traffic management plan requires on or beside a road); hard hat; safety glasses
- Emergency arrangements for: excavation collapse or person trapped, unit dropped or person crushed and power line contact
- Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)
Adjust it for your site, plant and crew, and talk it through with your workers before work starts. Please make sure you read our Disclaimer before downloading this SWMS.
Checked against the Queensland laws and codes of practice listed above. Last reviewed November 2026.
Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.
How to use it
From download to site in three steps
Buy and download
Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.
Make it yours
Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.
Brief your crew
Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.
What format is it?
Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.
How do I get it after I pay?
Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.
Is it compliant with Queensland law?
It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.
What if it isn't right for my job?
If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.
Only logged in customers who have purchased this product may leave a review.
More templates like this



Tandem Crane Lift SWMS
$49.99




Reviews