Skip to content

Roof Membrane and Sealant Application SWMS

Applying roof membranes and sealants in Queensland: roof falls, solvent fumes, hot work with torches and hot-air tools, slippery surfaces and edge work. An editable Word SWMS template.

RG

Written by Ryan Graham, health and safety professional (16 years on Queensland sites)

$49.99 incl. GST

AUD · one-off purchase · instant download

  • Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
  • Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
  • Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
  • Secure checkout · card, Apple Pay or Google Pay through Stripe

About this template

Suits roofing contractors, waterproofers and builders who apply liquid and sheet membranes and sealants to roofs. It covers roof inspection and asbestos checks, power lines, edge protection, handling and mixing products, surface preparation, application, hot work on laps and details, flashings and drains, and cure and handover. Edit the controls to match your membrane system and the manufacturer’s instructions.

Roof work with a fall of more than 2 metres is high risk construction work (WHS Regulation s 291), so that item is ticked and a SWMS is required before the work starts (s 299). If you apply solvent products in an enclosed space or a place where flammable vapour could build up, also tick the contaminated or flammable atmosphere item; add the energised electrical and asbestos items if they apply.

New to SWMS? Read What Is A Safe Work Method Statement?

What Is Covered In Our Roof Membrane and Sealant Application SWMS?

After the standard pre-start checks, the job steps run from “Plan the job and inspect the roof” to “Cure, check, clean up and hand over”. The hazards and controls include:

  • Falls from roof edges and through skylights
  • Slips on wet primer, dew and uncured membrane
  • Solvent fumes in primers and sealants
  • Fire from flammable liquids and solvent-soaked rags
  • Roof fires from torches and hot-air tools
  • Burns from hot tools and hot membrane
  • Skin and eye contact with chemicals
  • Silica dust from grinding the substrate
  • Asbestos in old roofing and flashings
  • Contact with overhead power lines
  • Heavy drums, pails and rolls on ladders
  • Heat, glare and sun on an exposed roof

High Risk Construction Work

These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:

  • Involves a risk of a person falling more than 2m

Licences, Training and Competency

  • General construction induction training card (white card) for construction work
  • Installer trained and experienced in the membrane or sealant system used, and in the manufacturer’s instructions for substrate, primer, lap and detail work
  • Training in the hazards of the products used (SDS and label), including solvent fumes, skin contact and respirator use and fit-testing
  • Training for anyone using a gas torch or hot-air tool, in the hot work permit and the fire watch
  • Training in the roof fall controls used (edge protection, travel restraint or a fall arrest harness system) and in the rescue procedure (WHS Regulation s 80)
  • No high risk work licence is needed for membrane or sealant work; a licence is needed only for a boom-type elevating work platform with a boom of 11 m or more (Schedule 3 item 21)
  • Workers the PCBU reasonably believes may be involved in asbestos-related work are trained under WHS Regulation s 445; everyone else stops and reports anything that may be asbestos
  • First aid equipment, facilities and trained first aiders (or access to them) as the work needs (WHS Regulation s 42)

Legislation and Codes of Practice Referenced

  • Work Health and Safety Act 2011 (Qld)
  • Work Health and Safety Regulation 2011 (Qld)
  • Managing the Risk of Falls at Workplaces Code of Practice 2021
  • Managing Risks of Hazardous Chemicals in the Workplace Code of Practice 2021 (including its hot work permit guidance)
  • Labelling of Workplace Hazardous Chemicals Code of Practice 2021
  • Preparation of Safety Data Sheets for Hazardous Chemicals Code of Practice 2021
  • Spray Painting and Powder Coating Code of Practice 2021 (where the product is sprayed)
  • Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements Code of Practice 2022 (grinding the substrate)
  • How to Manage and Control Asbestos in the Workplace Code of Practice 2021
  • Hazardous Manual Tasks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • First Aid in the Workplace Code of Practice 2021
  • Electrical Safety Act 2002 (Qld)
  • Electrical Safety Regulation 2026 (Qld): overhead line exclusion zones in sections 10 to 13 and schedule 2
  • Electrical Safety Code of Practice 2020 – Working near overhead and underground electric lines (distances come from the 2026 Regulation)

What You Get

  • An editable Microsoft Word document (15 A4 landscape pages). Type your business, client and job details once and they fill in on every page, with a space for your logo
  • 11 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
  • PPE listed for this job: non-slip safety boots suited to the membrane and roof surface; chemical-resistant gloves rated for the product (check the SDS), and long sleeves or coveralls
  • Emergency arrangements for: fall from the roof or through a roof opening, solvent or primer fire on the roof and chemical splash in the eyes or on skin, or breathing in fumes
  • Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)

Adjust it for your site, plant and crew, and talk it through with your workers before work starts. Please make sure you read our Disclaimer before downloading this SWMS.

Checked against the Queensland laws and codes of practice listed above. Last reviewed November 2026.

Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.

How to use it

From download to site in three steps

Buy and download

Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.

Make it yours

Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.

Brief your crew

Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.

FAQ

Before you buy

Something else? Ask us and a real person will reply.

What format is it?

Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.

How do I get it after I pay?

Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.

Is it compliant with Queensland law?

It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.

What if it isn't right for my job?

If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.

Reviews

Only logged in customers who have purchased this product may leave a review.

More templates like this