
Fire Hydrant and Hose Reel Installation SWMS
Installing fire hydrants and hose reels in Queensland, covering trenching, heavy pipe lifting, pressure testing and ceiling and riser work. An editable Word SWMS template for Queensland.
RG
Written by Ryan Graham, health and safety professional (16 years on Queensland sites)
$49.99 incl. GST
AUD · one-off purchase · instant download
- Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
- Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
- Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
- Secure checkout · card, Apple Pay or Google Pay through Stripe
About this template
Suits fire services and civil contractors who install underground hydrant mains, hydrants and hose reels on commercial and industrial sites. It follows the job from services location and trenching through pipe laying, hose reel fit-out, flushing and pressure tests, backfill and handover. Sprinkler systems are covered by a separate SWMS.
Powered mobile plant working in the area is inherent to hydrant main work, so that item is ticked. Tick the other items the job involves: a trench deeper than 1.5 metres, a fall of more than 2 metres, asbestos that could be disturbed, energised electrical installations or services, gas or fuel lines, a road in use, and the contaminated atmosphere item when dust is created.
New to SWMS? Read What Is A Safe Work Method Statement?
What Is Covered In Our Fire Hydrant and Hose Reel Installation SWMS?
After the standard pre-start checks, the job steps run from “Plan the job, find services and agree the connection” to “Clean up, record and hand over”. The hazards and controls include:
- Striking underground services
- Trench collapse
- Falling into open trenches
- Excavator and truck movements near workers
- Crushing by lifted pipe and valves
- Manual handling of heavy fittings
- Dust from cutting concrete and pipe
- Pipework failing under test pressure
- Wet cement burns
- Falls and ceiling hazards when fitting hose reels
- Traffic near roadside work
- Asbestos in older mains and linings
High Risk Construction Work
These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:
- Is carried out in an area at a workplace in which there is any movement of powered mobile plant
Licences, Training and Competency
- General construction induction training card (white card) for construction work, and site induction
- Fire protection or plumbing licence or endorsement as required by Queensland law for the work being done; the employer checks it before work starts
- High risk work licence in the dogging class, or a higher rigging class (WHS Regulation schedule 3), for slinging loads or directing a plant operator when the load is out of the operator’s view
- Excavator and plant operators trained and assessed as competent on the machine (no high risk work licence class applies to operating an excavator)
- Competent person to inspect the trench, shoring and plant daily
- Accredited traffic controllers where traffic control is needed on or beside a road (Transport Operations (Road Use Management – Accreditation and Other Provisions) Regulation 2015 ss 51, 54, 55; separate SWMS)
- Asbestos training for workers who may be involved in asbestos-related work, such as in older buildings (WHS Regulation s 445)
- Crystalline silica training where the dust assessment finds the work high risk
- Licensed electrical worker for any electrical work, for example pump or alarm connections (Electrical Safety Act 2002, s 55)
Legislation and Codes of Practice Referenced
- Work Health and Safety Act 2011 (Qld)
- Work Health and Safety Regulation 2011 (Qld)
- Work Health and Safety Regulation 2011 (Qld): ss 304 to 306 (excavation work), ss 306A to 306N (falls, ladders and trestle platforms in construction work)
- Work Health and Safety Regulation 2011 (Qld): ss 56 and 57 (noise), s 224 (pressure equipment), s 445 (asbestos training) and ss 529A to 529CD (crystalline silica)
- Excavation Work Code of Practice 2021
- Managing Risks of Plant in the Workplace Code of Practice 2021
- Managing the Risk of Falls at Workplaces Code of Practice 2021
- Hazardous Manual Tasks Code of Practice 2021
- Managing Noise and Preventing Hearing Loss at Work Code of Practice 2021
- Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements Code of Practice 2022
- How to Manage and Control Asbestos in the Workplace Code of Practice 2021
- Managing Risks of Hazardous Chemicals in the Workplace Code of Practice 2021
- Managing the Work Environment and Facilities Code of Practice 2021
- First Aid in the Workplace Code of Practice 2021
- How to Manage Work Health and Safety Risks Code of Practice 2021
- Traffic Management for Construction or Maintenance Work Code of Practice 2008
- Transport Operations (Road Use Management – Accreditation and Other Provisions) Regulation 2015 (Qld): traffic controllers, sections 51 to 55
- Electrical Safety Act 2002 (Qld)
- Electrical Safety Regulation 2026 (Qld): s 10 and sch 2 (overhead power line exclusion zones)
- Electrical Safety Code of Practice 2020 – Working near overhead and underground electric lines
- Building Fire Safety Regulation 2008 (Qld): s 7 (person not to obstruct an evacuation route) and part 5 (prescribed fire safety installations)
What You Get
- An editable Microsoft Word document (15 A4 landscape pages). Type your business, client and job details once and they fill in on every page, with a space for your logo
- 10 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
- PPE listed for this job: safety boots; high-visibility long-sleeve shirt and trousers; hard hat on construction sites; safety glasses
- Emergency arrangements for: trench collapse or person trapped, service strike (gas, electric, fuel) and burst main or test hose
- Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)
Adjust it for your site, plant and crew, and talk it through with your workers before work starts. Please make sure you read our Disclaimer before downloading this SWMS.
Checked against the Queensland laws and codes of practice listed above. Last reviewed November 2026.
Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.
How to use it
From download to site in three steps
Buy and download
Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.
Make it yours
Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.
Brief your crew
Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.
What format is it?
Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.
How do I get it after I pay?
Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.
Is it compliant with Queensland law?
It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.
What if it isn't right for my job?
If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.
Only logged in customers who have purchased this product may leave a review.
More templates like this
$39.99






Reviews