Skip to content

Building Facade Cleaning SWMS

Cleaning building facades from EWPs, swing stages and ropes in Queensland, covering falls, chemicals, overspray and dropped objects. An editable Word SWMS template for Queensland.

RG

Written by Ryan Graham, health and safety professional (16 years on Queensland sites)

$39.99 incl. GST

AUD · one-off purchase · instant download

  • Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
  • Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
  • Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
  • Secure checkout · card, Apple Pay or Google Pay through Stripe

About this template

For commercial cleaning and building maintenance contractors who wash facades, cladding and glass from elevating work platforms, swing stages and rope systems. It follows the job from planning and power line checks to access, chemical use, rinsing, rescue and pack-up.

A SWMS is required by law for high risk construction work (WHS Regulation s 299), and this plan requires one for every facade cleaning job. No item is pre-ticked. Cleaning that is part of a building repair or restoration is construction work (WHS Regulation s 289). Tick the items that apply, such as a fall of more than 2 metres or work near energised electrical services.

New to SWMS? Read What Is A Safe Work Method Statement?

What Is Covered In Our Building Facade Cleaning SWMS?

After the standard pre-start checks, the job steps run from “Plan the job and choose the access method” to “Wash down, dismantle and pack up”. The hazards and controls include:

  • Falls from EWPs, swing stages and ropes
  • EWP tip-over and entrapment
  • Swing stage failure and stuck platforms
  • Contact with overhead power lines
  • Chemical splashes and mixing incompatible products
  • Overspray and run-off to drains and property
  • Dropped tools and brushes striking people below
  • Hose and jet reaction force
  • Slippery platforms
  • Wind, rain and lightning at height
  • Heat and sun on reflective facades
  • Rescue after a fall or equipment failure

High Risk Construction Work

None of the high risk construction work items (WHS Regulation 2011 (Qld) s 291) are pre-ticked, because this job is not high risk construction work by itself. Tick any that apply on your site.

Licences, Training and Competency

  • High risk work licence for the boom-type elevating work platform class where the boom length is 11 m or more (Schedule 3, item 21); no licence for scissor lifts, spider lifts or ladders
  • Advanced scaffolding class licence, or the advanced rigging class, for anyone who installs, alters or dismantles a suspended scaffold (swing stage); installers also need competence in suspended scaffolds (Schedule 3, items 3 and 7)
  • Course in the safe use of swing stage scaffolds, or an equivalent course, for everyone who works from a swing stage (as the Scaffolding code advises)
  • Training and competency for the access equipment, rescue and retrieval, and for fall arrest equipment where it is used
  • Training in the cleaning products used: SDS, dilution, spills, eyewash, and what must never be mixed
  • Respirator fit testing and training where the SDS or the risk assessment calls for respiratory protection
  • General construction induction training card (white card) where the cleaning is part of a construction project or building repair
  • Site induction with the building manager, including lift, roof, alarm and emergency rules
  • First aid equipment, facilities and trained first aiders (or access to them) as the work needs (WHS Regulation s 42)

Legislation and Codes of Practice Referenced

  • Work Health and Safety Act 2011 (Qld)
  • Work Health and Safety Regulation 2011 (Qld)
  • Work Health and Safety Regulation 2011 (Qld): ss 78 to 80 (falls), s 54 (falling objects), s 225 (scaffolds), s 446 (no high pressure water on asbestos)
  • Work Health and Safety Regulation 2011 (Qld): ss 341, 342, 344, 346, 351 and 354 (labelling, decanting, safety data sheets, register, managing chemical risks and reactions)
  • Work Health and Safety Regulation 2011 (Qld): ss 36, 44 to 46 (hierarchy of control, personal protective equipment)
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Risk of Falls at Workplaces Code of Practice 2021
  • Managing Risks of Plant in the Workplace Code of Practice 2021
  • Scaffolding Code of Practice 2021
  • Managing Risks of Hazardous Chemicals in the Workplace Code of Practice 2021
  • Labelling of Workplace Hazardous Chemicals Code of Practice 2021
  • Hazardous Manual Tasks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021
  • First Aid in the Workplace Code of Practice 2021
  • How to Manage and Control Asbestos in the Workplace Code of Practice 2021
  • Electrical Safety Act 2002 (Qld)
  • Electrical Safety Regulation 2026 (Qld): overhead electric line exclusion zones and unsafe distances, ss 10 to 13 and schedule 2
  • Electrical Safety Code of Practice 2020 – Working near overhead and underground electric lines (distances come from the 2026 Regulation)
  • Safe Work Australia model Code of Practice: Elevating work platforms (guidance only: a model code, not approved in Queensland)

What You Get

  • An editable Microsoft Word document (16 A4 landscape pages). Type your business, client and job details once and they fill in on every page, with a space for your logo
  • 11 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
  • PPE listed for this job: fall arrest harness and short lanyard attached to the platform anchor point in a boom-type EWP; harness and lanyard on a swing stage, attached to the lifeline not to the stage
  • Emergency arrangements for: fall, swing stage failure or entrapment, chemical in eyes or on skin and contact with a power line
  • Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)

Adjust it for your site, plant and crew, and talk it through with your workers before work starts. Please make sure you read our Disclaimer before downloading this SWMS.

Checked against the Queensland laws and codes of practice listed above. Last reviewed November 2026.

Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.

How to use it

From download to site in three steps

Buy and download

Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.

Make it yours

Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.

Brief your crew

Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.

FAQ

Before you buy

Something else? Ask us and a real person will reply.

What format is it?

Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.

How do I get it after I pay?

Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.

Is it compliant with Queensland law?

It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.

What if it isn't right for my job?

If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.

Reviews

Only logged in customers who have purchased this product may leave a review.

More templates like this