Static Traffic Control Setup and Removal SWMS
Setting up, checking and removing static traffic control on Queensland roads: signs, barriers, protection vehicles and work vehicles beside live traffic. An editable Word SWMS template.
RG
Written by Ryan Graham, health and safety professional (16 years on Queensland sites)
$49.99 incl. GST
AUD · one-off purchase · instant download
- Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
- Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
- Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
- Secure checkout · card, Apple Pay or Google Pay through Stripe
About this template
Suits civil, utility, building and traffic management crews who set up, check and take down the signs and devices of a traffic guidance scheme at a static worksite on or beside a road in use. It covers loading and vehicle positioning, protection vehicles, placing devices beside live traffic, checking the finished layout, after-hours arrangements and removal in reverse order. Directing traffic with traffic controllers is covered by the separate Traffic Management SWMS.
New to SWMS? Read What is a safe work method statement?
What is covered in our static traffic control setup and removal SWMS?
After the standard pre-start checks, the job steps run from “Check the traffic guidance scheme against the site and plan the set-up” to “Remove the devices in reverse order and reopen the road”. The hazards and controls include:
- Crew struck by passing vehicles while placing devices
- Work vehicles struck entering or leaving the work area
- Wrong sign order or missing devices during set-up
- Vehicles entering the work zone
- Barriers misplaced or filled wrongly
- Layout damaged or displaced during the shift
- Signs and lamps failing at an unattended site after hours
- Contact with overhead power lines
- Strains lifting barriers, bases and signs
- Reversing vehicles in the work area
- Heat, sun and fatigue
- Poor visibility at night and in rain
- Abuse from frustrated road users
- Devices left on the road after removal
High risk construction work
These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:
- Is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians
- Is carried out in an area at a workplace in which there is any movement of powered mobile plant
Licences, training and competency
- General construction induction training card (white card) for construction work on or beside a road
- Working in Proximity to Traffic training (Department of Transport and Main Roads online course, Parts 1 and 2) for all workers on or next to a road, as the Traffic Management for Construction or Maintenance Work Code of Practice 2008 recommends
- Traffic Management Implement training from an approved provider for anyone who sets up, checks and removes the traffic guidance scheme (the code of practice recommends it for people who implement a traffic management plan)
- Traffic Management Design training for the person who designs or changes the traffic guidance scheme (recommended by the code of practice)
- Queensland traffic controller accreditation applies to anyone who directs traffic; directing traffic is covered by the separate Traffic Management SWMS and not by this SWMS
- Current driver licence for the class of vehicle driven, and training in the protection vehicle, attenuator and arrow board from the supplier or the manufacturer’s instructions
- High risk work licence for the class of any crane or forklift truck used to place barriers, and in the dogging class or a higher rigging class (Schedule 3) for anyone who slings barriers or directs a plant operator in the movement of a load when the load is out of the operator’s view (Schedule 19, dogging work); a vehicle loading crane licence for 10 metre tonnes or more also covers slinging by its operator
- Site induction
Legislation and codes of practice referenced
- Work Health and Safety Act 2011 (Qld)
- Work Health and Safety Regulation 2011 (Qld)
- Traffic Management for Construction or Maintenance Work Code of Practice 2008
- Manual of Uniform Traffic Control Devices Part 3 (MUTCD Part 3)
- Transport Operations (Road Use Management) Act 1995 (Qld): section 72A, official traffic signs installed in the way the MUTCD specifies
- Transport Operations (Road Use Management – Accreditation and Other Provisions) Regulation 2015 (Qld): traffic controller accreditation
- Traffic Controller Accreditation Scheme Approved Procedure (TCASAP)
- Managing Risks of Plant in the Workplace Code of Practice 2021
- Hazardous Manual Tasks Code of Practice 2021
- Managing Noise and Preventing Hearing Loss at Work Code of Practice 2021
- Managing the Work Environment and Facilities Code of Practice 2021
- Managing the risk of psychosocial hazards at work Code of Practice 2022
- How to Manage Work Health and Safety Risks Code of Practice 2021
- Mobile Crane Code of Practice 2024 (where a vehicle loading crane places barriers)
- Electrical Safety Act 2002 (Qld)
- Electrical Safety Regulation 2026 (Qld): overhead power line exclusion zones in schedule 2
- Electrical Safety Code of Practice 2020 – Working near overhead and underground electric lines (distances come from the 2026 Regulation)
- Safe Work Australia model Code of Practice: Managing the risk of fatigue at work (guidance)
What you get
- An editable Microsoft Word document (17 pages), laid out on A4 landscape pages. Type your business, client and job details once and they fill in on every page, with a space for your logo
- 11 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
- PPE listed for this job: safety boots; high-visibility long-sleeved shirt and trousers, or a vest, of the class the traffic management plan requires (day, night or day/night); retroreflective vest or gaiters for night work
- Emergency arrangements for: vehicle enters the work area, worker struck by a vehicle and heat illness
- Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)
Adjust it for your site, plant and crew, and talk it through with your workers before work starts.
Checked against the Queensland laws and codes of practice listed above. Last reviewed November 2026.
Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.
How to use it
From download to site in three steps
Buy and download
Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.
Make it yours
Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.
Brief your crew
Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.
What format is it?
Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.
How do I get it after I pay?
Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.
Is it compliant with Queensland law?
It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.
What if it isn't right for my job?
If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.
Only logged in customers who have purchased this product may leave a review.







Reviews