
Solar Hot Water System Installation SWMS
Installing roof-mounted solar hot water collectors and tanks in Queensland: lifting, roof edges, plumbing and electrical connections and scald risks. An editable Word SWMS template.
RG
Written by Ryan Graham, health and safety professional (16 years on Queensland sites)
$49.99 incl. GST
AUD · one-off purchase · instant download
- Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
- Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
- Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
- Secure checkout · card, Apple Pay or Google Pay through Stripe
About this template
Suits plumbers, solar hot water installers and roofing contractors who fit collectors and tanks to roofs. It follows the job in order, from roof and structure checks, fall protection and lifting through fixing, plumbing and electrical connections to filling, commissioning and handover.
A SWMS is required under WHS Regulation s 299 when the work is construction work and a person could fall more than 2 metres (s 291), so that is the item ticked; testing, maintenance or repair work of a minor nature is not construction work (s 289(3)(d)). You can also tick powered mobile plant when a crane or forklift works in the area, energised electrical installations if power lines or live services are near, and the contaminated atmosphere item if drilling masonry or tiles creates silica dust, as the Queensland silica code advises.
New to SWMS? Read What is a safe work method statement?
What is covered in our solar hot water system installation SWMS?
After the standard pre-start checks, the job steps run from “Plan the job and assess the roof, structure and services” to “Work in heat, sun, wind and storms”. The hazards and controls include:
- Falls from the roof edge, ladders and fragile roofing
- Roof or structure overloaded by a filled tank
- Collectors blown off or dropped during lifts
- Contact with overhead and service power lines
- Being struck by cranes, forklifts and falling loads
- Asbestos and hidden cables when drilling the roof
- Silica dust from drilling tiles and masonry
- Fire and burns from brazing and soldering
- Scalding at taps and the relief valve during commissioning
- Plumbing and electrical work done without the right licence
- Electric shock when connecting the booster
- Heat illness and sunburn on a hot roof
High risk construction work
These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:
- Involves a risk of a person falling more than 2m
Licences, training and competency
- Plumbers licence with the solar and heat pump hot water system installation endorsement, which covers installing, maintaining, repairing, replacing and testing them (Plumbing and Drainage Regulation 2019 schedule 4 part 4 item 5; a plumbers licence alone does not cover this work; Plumbing and Drainage Act 2018 s 56); the business also holds a QBCC contractor licence in the Plumbing and drainage class, needed at any job value (QBCC Regulation 2018 sch 1 item 2(b) and sch 2 pt 18)
- Electrical work licence for the electric booster, its thermostat and the supply wiring (Electrical Safety Act 2002 ss 14, 18 and 55), and an electrical contractor licence for the business (s 56)
- High risk work licence for lifting the system onto the roof: crane class (vehicle loading crane of 10 metre tonnes or more, or mobile crane) or forklift truck class for the operator, and the dogging class or a higher rigging class (Schedule 3 items 4 to 7) for anyone who slings the load or directs a plant operator moving it out of the operator’s view
- Boom-type elevating work platform licence (boom of 11 m or more, Schedule 3 item 21) if one is used for access; Schedule 3 has no high risk work licence class for scissor lifts or shorter boom-type platforms
- Scaffolding high risk work licence (Schedule 3 items 1 to 3) for erecting, altering or dismantling any scaffold from which a person or object could fall more than 4 m (separate SWMS)
- Fall protection and rescue training for everyone on the roof, and a competent person to install and inspect travel restraint and approve anchors (WHS Regulation ss 306G, 306I)
- Asbestos awareness training for workers who may disturb roofing, eaves, flues or ceilings; crystalline silica training where the dust assessment finds drilling or cutting tiles or masonry high risk (WHS Regulation s 529CD)
- General construction induction training card (white card) for construction work, and site induction (roof access, rescue)
- First aid equipment and facilities, and trained first aiders as the work and site need (WHS Regulation s 42)
Legislation and codes of practice referenced
- Work Health and Safety Act 2011 (Qld)
- Work Health and Safety Regulation 2011 (Qld)
- Plumbing and Drainage Act 2018 (Qld) and Plumbing and Drainage Regulation 2019 (Qld) (plumbing licences, the solar hot water endorsement, notifiable work and temperature control devices)
- Electrical Safety Act 2002 (Qld)
- Electrical Safety Regulation 2026 (Qld): electrical work licences, isolation and testing, roof space entry (ss 31 to 36), and overhead power line exclusion zones in schedule 2
- Electrical Safety Code of Practice 2021 – Managing electrical risks in the workplace
- Electrical Safety Code of Practice 2020 – Working near overhead and underground electric lines (distances come from the 2026 Regulation)
- Managing the Risk of Falls at Workplaces Code of Practice 2021
- Scaffolding Code of Practice 2021 (where scaffold gives roof access)
- Managing Risks of Plant in the Workplace Code of Practice 2021
- Mobile Crane Code of Practice 2024 (where a vehicle loading crane or other crane lifts the tank or collectors)
- Hazardous Manual Tasks Code of Practice 2021
- Managing Noise and Preventing Hearing Loss at Work Code of Practice 2021
- Managing the Work Environment and Facilities Code of Practice 2021
- Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements Code of Practice 2022
- How to Manage and Control Asbestos in the Workplace Code of Practice 2021
- Welding Processes Code of Practice 2021 (brazing and soldering are allied processes)
- Managing Risks of Hazardous Chemicals in the Workplace Code of Practice 2021
- First Aid in the Workplace Code of Practice 2021
- How to Manage Work Health and Safety Risks Code of Practice 2021
- WorkSafe Queensland guidance: Managing the risk of falls while working on roofs in housing construction (guidance, not a code)
- AS/NZS 3012 Electrical installations – Construction and demolition sites (named in the Electrical Safety Regulation 2026 for electrical equipment used for construction work)
What you get
- An editable Microsoft Word document (20 pages), laid out on A4 landscape pages. Type your business, client and job details once and they fill in on every page, with a space for your logo
- 11 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
- PPE listed for this job: non-slip safety boots with soft soles suited to the roof surface; hard hat, with a chin strap where wind or a fall risk exists
- Emergency arrangements for: fall from the roof or through a roof or ceiling, scald or burn and worker hanging in a harness
- Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)
Adjust it for your site, plant and crew, and talk it through with your workers before work starts.
Checked against the Queensland laws and codes of practice listed above. Last reviewed October 2026.
Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.
How to use it
From download to site in three steps
Buy and download
Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.
Make it yours
Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.
Brief your crew
Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.
What format is it?
Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.
How do I get it after I pay?
Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.
Is it compliant with Queensland law?
It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.
What if it isn't right for my job?
If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.
Only logged in customers who have purchased this product may leave a review.







Reviews