Skip to content

Solar Farm Tracker and Module Installation SWMS

Installing trackers and PV modules on Queensland solar farms: manual handling, heat, live modules, mobile plant, glass and snakes. An editable Word SWMS template.

RG

Written by Ryan Graham, health and safety professional (16 years on Queensland sites)

$49.99 incl. GST

AUD · one-off purchase · instant download

  • Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
  • Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
  • Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
  • Secure checkout · card, Apple Pay or Google Pay through Stripe

About this template

For solar farm installation crews and contractors who fix tracker structures, torque tubes, drives and PV modules in large ground-mounted arrays. It follows the job from site briefing and plant movement through unloading, tracker assembly, module fixing and the handover to the electrical crew.

Powered mobile plant working among the rows and live modules mean items 14 and 10 are ticked. Tick other items that apply: a trench deeper than 1.5 metres (item 6), a fall of more than 2 metres (item 0), a road in use beside the work (item 13). Rooftop solar is covered by the Solar Panel Installation SWMS, and connecting, earthing and testing modules must be done by a licensed electrical worker.

New to SWMS? Read What Is A Safe Work Method Statement?

What Is Covered In Our Solar Farm Tracker and Module Installation SWMS?

After the standard pre-start checks, the job steps run from “Plan the work, brief the crew and set up emergency arrangements” to “Pack up, remove waste and hand over to other trades”. The hazards and controls include:

  • Powered mobile plant striking workers among the rows
  • Overhead power lines and underground cables
  • Falling loads when unloading and lifting
  • Crush injuries when fixing torque tubes and drives
  • Strains from repeated module handling
  • Glass cuts and broken modules
  • Live modules and unlicensed connections
  • Heat stress, sun and fatigue
  • Snake bite and Q fever
  • Storms, wind and lightning
  • Noise from tools and generators
  • Remote site emergency response

High Risk Construction Work

These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:

  • Is carried out on or near energised electrical installations or services
  • Is carried out in an area at a workplace in which there is any movement of powered mobile plant

Licences, Training and Competency

  • General construction induction training card (white card) for construction work, and a site induction that covers snakes, heat, live modules and emergency contacts
  • Electrical work, including connecting or disconnecting PV module cables and plug-in connectors, earth connections and testing, only by a worker holding an electrical work licence for it, or an apprentice performing it in their calling (Electrical Safety Act 2002 ss 18 and 55)
  • Person holding the dogging licence class where loads are slung or a crane operator is directed (WHS Regulation Schedules 3 and 19); crane operators hold the licence for their crane class
  • Forklift truck operators hold the forklift truck high risk work licence class (WHS Regulation Schedule 3); operators of telehandlers, utility vehicles and excavators are trained and assessed as competent for the make, model and attachments (no high risk work licence applies to earthmoving machinery or telehandlers in general; check Schedule 3 for the plant used)
  • Training in hazardous manual tasks, the tracker and module supplier’s installation method, and heat illness
  • Remote first aid training, including snake bite, for trained first aiders
  • First aid equipment, facilities and trained first aiders (or access to them) as the work needs (WHS Regulation s 42)

Legislation and Codes of Practice Referenced

  • Work Health and Safety Act 2011 (Qld)
  • Work Health and Safety Regulation 2011 (Qld)
  • Construction and Operation of Solar Farms Code of Practice 2024
  • Managing Risks of Plant in the Workplace Code of Practice 2021
  • Hazardous Manual Tasks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021
  • First Aid in the Workplace Code of Practice 2021
  • Managing Noise and Preventing Hearing Loss at Work Code of Practice 2021
  • Excavation Work Code of Practice 2021 (footings, trenches and underground services)
  • Mobile Crane Code of Practice 2024 (where a crane lifts)
  • Managing the Risk of Falls at Workplaces Code of Practice 2021
  • Traffic Management for Construction or Maintenance Work Code of Practice 2008
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Electrical Safety Act 2002 (Qld): s 18 (electrical work) and s 55 (electrical work licence)
  • Electrical Safety Regulation 2026 (Qld): overhead exclusion zones (ss 10 to 13, Sch 2) and underground lines (ss 14 and 15)
  • Electrical Safety Code of Practice 2021 – Managing electrical risks in the workplace

What You Get

  • An editable Microsoft Word document (15 A4 landscape pages). Type your business, client and job details once and they fill in on every page, with a space for your logo
  • 11 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
  • PPE listed for this job: leather safety boots with ankle cover; high-visibility long-sleeved shirt and long pants; hard hat with a brim or neck cover; cut-resistant gloves
  • Emergency arrangements for: snake or spider bite, heat stroke and electric shock or arc flash
  • Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)

Adjust it for your site, plant and crew, and talk it through with your workers before work starts. Please make sure you read our Disclaimer before downloading this SWMS.

Checked against the Queensland laws and codes of practice listed above. Last reviewed November 2026.

Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.

How to use it

From download to site in three steps

Buy and download

Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.

Make it yours

Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.

Brief your crew

Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.

FAQ

Before you buy

Something else? Ask us and a real person will reply.

What format is it?

Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.

How do I get it after I pay?

Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.

Is it compliant with Queensland law?

It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.

What if it isn't right for my job?

If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.

Reviews

Only logged in customers who have purchased this product may leave a review.

More templates like this