Skip to content

Post-Tensioning Stressing SWMS

Stressing post-tensioned tendons with hydraulic jacks in Queensland: tendon whip, jack failure, exclusion zones, hydraulic pressure and slab edges. An editable Word SWMS template.

RG

Written by Ryan Graham, health and safety professional (16 years on Queensland sites)

$49.99 incl. GST

AUD · one-off purchase · instant download

  • Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
  • Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
  • Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
  • Secure checkout · card, Apple Pay or Google Pay through Stripe

About this template

Suits post-tensioning crews and concrete contractors who stress tendons in suspended slabs, ground slabs and beams. It follows the stressing from the engineer’s documents and concrete strength, exclusion zones and edge protection, through jack set-up, hydraulic connection and the stress itself, to problems, tail cutting and clean-up, and it gives no forces, pressures or exclusion zone distances, which come from the post-tensioning designer, the system supplier’s stressing procedure and the project engineer. Placing and fixing tendons before the pour is covered by a separate SWMS.

Stressing is not high risk construction work by itself, but a SWMS is legally required when the work involves a risk of a fall of more than 2 metres, as at the edge of a suspended slab (WHS Regulation sections 291 and 299); that item is ticked for suspended slab work, so untick it for slab-on-ground work where nobody could fall more than 2 metres, and tick others where the job meets them, such as powered mobile plant when a crane lifts the equipment.

New to SWMS? Read What is a safe work method statement?

What is covered in our post-tensioning stressing SWMS?

After the standard pre-start checks, the job steps run from “Check the stressing documents, concrete strength and equipment” to “Record the results, clean up and leave the area safe”. The hazards and controls include:

  • Tendon whip and strand failure under load
  • Jack, wedge or anchorage failure
  • People behind or in line with the jack
  • High-pressure hydraulic oil injection
  • Hose burst or whip
  • Stressing before the concrete has reached strength
  • Falls from the slab edge
  • Tools and wedges falling onto people below
  • Manual handling of jacks and pumps
  • Electric shock from the power pack
  • Strand cuts and sparks when cutting tails
  • Noise from cutting tendon tails
  • Edge protection left open after stressing

High risk construction work

These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:

  • Involves a risk of a person falling more than 2m

Licences, training and competency

  • General construction induction training card (white card) for construction work
  • Site induction, including the exclusion zones, signals and emergency plan
  • Stressing crew trained and assessed by the post-tensioning system supplier on the system, jack and pump used, with a competent person in charge of each gang
  • Post-tensioning designer or project engineer to issue the stressing drawings, sequence, forces and extensions, and to confirm the concrete strength in writing before stressing
  • High risk work licence in the dogging class, or a higher rigging class (Schedule 3 items 4 to 7), for anyone who slings a jack or pump, or directs a plant operator in moving a load that is out of the operator’s view (Schedule 19, dogging work); the holder of a vehicle loading crane licence of 10 metre tonnes or more (item 13) may sling for their own crane
  • High risk work licence for the class of any crane used to lift equipment to the slab, or of any materials hoist or personnel and materials hoist (Schedule 3 items 8 to 20)
  • Training in the fall prevention or fall arrest equipment used (WHS Regulation s 39) and, where a harness system is used, in the rescue plan (s 80)
  • Competent person to inspect and maintain the jacks, pumps, gauges and hoses to the maker’s recommendations (WHS Regulation s 213)
  • First aid equipment and facilities, and trained first aiders (or access to them) as the work, hazards and site need, with no fixed number in the Regulation (WHS Regulation s 42; First Aid in the Workplace Code of Practice 2021)

Legislation and codes of practice referenced

  • Work Health and Safety Act 2011 (Qld)
  • Work Health and Safety Regulation 2011 (Qld)
  • Work Health and Safety Regulation 2011 (Qld): ss 78 to 80 and 306A to 306J (falls)
  • Work Health and Safety Regulation 2011 (Qld): ss 203, 206 and 213 (plant) and ss 315B to 315M (falling objects)
  • Managing Risks of Plant in the Workplace Code of Practice 2021
  • Formwork Code of Practice 2016
  • Managing the Risk of Falls at Workplaces Code of Practice 2021
  • Demolition Work Code of Practice 2021 (section 5.1, stored energy in tensioned tendons)
  • Hazardous Manual Tasks Code of Practice 2021
  • Managing Noise and Preventing Hearing Loss at Work Code of Practice 2021
  • Managing Risks of Hazardous Chemicals in the Workplace Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021
  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Mobile Crane Code of Practice 2024 (where a crane lifts jacks and pumps)
  • Electrical Safety Act 2002 (Qld)
  • Electrical Safety Regulation 2026 (Qld): s 140 (electrical equipment for construction work)

What you get

  • An editable Microsoft Word document (18 pages), laid out on A4 landscape pages. Type your business, client and job details once and they fill in on every page, with a space for your logo
  • 9 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
  • PPE listed for this job: safety boots; hard hat with a chin strap when working near the slab edge; high-visibility clothing; safety glasses, and a face shield for cutting tails
  • Emergency arrangements for: strand, wedge or jack failure, hydraulic oil injected into the skin and fall from the slab edge or a person suspended in a harness
  • Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)

Adjust it for your site, plant and crew, and talk it through with your workers before work starts.

Checked against the Queensland laws and codes of practice listed above. Last reviewed October 2026.

Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.

How to use it

From download to site in three steps

Buy and download

Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.

Make it yours

Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.

Brief your crew

Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.

FAQ

Before you buy

Something else? Ask us and a real person will reply.

What format is it?

Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.

How do I get it after I pay?

Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.

Is it compliant with Queensland law?

It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.

What if it isn't right for my job?

If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.

Reviews

Only logged in customers who have purchased this product may leave a review.

More templates like this