
Pool Plastering and Finishing SWMS
Plastering and finishing pool interiors in Queensland: wet cement burns, deep shells, dust, mixing, pumping and finishing chemicals. An editable Word SWMS template.
RG
Written by Ryan Graham, health and safety professional (16 years on Queensland sites)
$39.99 incl. GST
AUD · one-off purchase · instant download
- Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
- Make it yours in minutes · edit in Microsoft Word and add your logo
- Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
- Secure checkout · card, Apple Pay or Google Pay through Stripe
About this template
Suits pool plasterers and finishers applying plaster, quartz or pebble finishes inside new or renovated pool shells. It follows the work from checking the shell and entry, through surface preparation, mixing, application and finishing, to filling and pack-up. It does not cover tiling, which has its own Tiling SWMS.
A SWMS is required by law for high risk construction work (WHS Regulation s 299), and a pool shell is not by itself a shaft or trench. Tick the ‘shaft or trench deeper than 1.5 m’ item only if the excavation meets that definition, the ‘fall of more than 2 m’ item if a person could fall that far, and the confined space or contaminated atmosphere items if they apply. Otherwise this works as a written safe work procedure.
New to SWMS? Read What Is A Safe Work Method Statement?
What Is Covered In Our Pool Plastering and Finishing SWMS?
After the standard pre-start checks, the job steps run from “Check the shell and set up safe entry and exit” to “Clean up, waste disposal and pack-up”. The hazards and controls include:
- Falls into the open pool shell
- Unstable shell walls or shotcrete
- Caustic burns from wet cement and plaster
- Silica dust from grinding and mixing
- Heat stress in a reflective shell
- Fumes and poor air in a deep shell
- Working alone or being unable to get out
- Wet leads and electric shock
- Hose whip and blockage release
- Acid wash and surface chemical burns
- Slippery wet plaster and steps
- Alkaline slurry reaching drains
High Risk Construction Work
None of the high risk construction work items (WHS Regulation 2011 (Qld) s 291) are pre-ticked, because this job is not high risk construction work by itself. Tick any that apply on your site.
Licences, Training and Competency
- General construction induction training card (white card)
- Experience or training in applying pool plaster and pool finishes
- Silica training where the work is high risk silica processing (s 529CD)
- Training in the pump and mixer used
- Site induction
Legislation and Codes of Practice Referenced
- Work Health and Safety Act 2011 (Qld)
- Work Health and Safety Regulation 2011 (Qld)
- Managing the Risk of Falls at Workplaces Code of Practice 2021
- Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements Code of Practice 2022
- Managing Risks of Hazardous Chemicals in the Workplace Code of Practice 2021
- Confined Spaces Code of Practice 2021
- Managing Noise and Preventing Hearing Loss at Work Code of Practice 2021
- Hazardous Manual Tasks Code of Practice 2021
- Managing Risks of Plant in the Workplace Code of Practice 2021
- Managing the Work Environment and Facilities Code of Practice 2021
- First Aid in the Workplace Code of Practice 2021
What You Get
- An editable Microsoft Word document (12 A4 landscape pages). Type your business, client and job details once and they fill in on every page, with a space for your logo
- 9 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
- PPE listed for this job: safety boots or rubber boots; alkali-resistant gloves; safety glasses, face shield or goggles; long sleeves and long pants; waterproof knee protection
- Emergency arrangements for: caustic or acid contact and person unwell or collapsed in the shell
- Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)
Adjust it for your site, plant and crew, and talk it through with your workers before work starts. Please make sure you read our Disclaimer before downloading this SWMS.
Checked against the Queensland laws and codes of practice listed above. Last reviewed November 2026.
Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.
How to use it
From download to site in three steps
Buy and download
Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.
Make it yours
Open it in Microsoft Word or Excel. Add your logo, business details, site and job information, and adjust it to how the work is done.
Brief your crew
Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.
What format is it?
Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details.
How do I get it after I pay?
Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.
Is it compliant with Queensland law?
It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.
What if it isn't right for my job?
If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.
More templates like this
$49.99
Hot Work SWMS
$39.99
Concreting SWMS
$59.99




Reviews