Skip to content

Personnel and Materials Hoist Operation SWMS

Operating personnel and materials hoists on Queensland building sites: loading limits, gate interlocks, falls at landings and emergency lowering. An editable Word SWMS template.

RG

Written by Ryan Graham, health and safety professional (16 years on Queensland sites)

$49.99 incl. GST

AUD · one-off purchase · instant download

  • Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
  • Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
  • Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
  • Secure checkout · card, Apple Pay or Google Pay through Stripe

About this template

For builders, hoist hire companies and trade contractors whose workers operate or ride personnel and materials hoists, or send materials up them, on building sites. It follows the job from planning the use of the hoist and the daily inspection through landing set-up, loading, travel and getting on and off at landings to a stuck car, power, wind and shut-down. Erecting, climbing and dismantling the hoist are not covered and need a separate SWMS.

Operating a hoist on a construction site is high risk construction work when a person could fall more than 2 metres at an upper landing (WHS Regulation ss 289, 291(a) and 299), so that item is ticked and a SWMS is required before the work starts; away from construction work this document works as a written safe work procedure or task risk assessment. You can also tick energised electrical installations when the hoist, mast or its materials are near overhead lines, and powered mobile plant when delivery vehicles or other plant move near the base.

New to SWMS? Read What is a safe work method statement?

What is covered in our personnel and materials hoist operation SWMS?

After the standard pre-start checks, the job steps run from “Plan the use of the hoist and check it is ready for use” to “Isolate, secure and shut down at the end of the shift”. The hazards and controls include:

  • Overloading the car or carrying people in a materials hoist
  • Car or landing gates left open or interlocks bypassed
  • Falls from landings and loading platforms
  • Crush between the car, the landing and the structure
  • People struck by the car or falling objects at the base
  • Stuck car and unplanned exits between levels
  • Untrained or unauthorised operation
  • Contact with overhead power lines
  • Electric shock from the hoist supply and leads
  • High wind and lightning
  • Strains and hand injuries loading materials
  • Vehicles and plant at the hoist base
  • Defective hoist used after a missed inspection

High risk construction work

These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:

  • Involves a risk of a person falling more than 2m

Licences, training and competency

  • High risk work licence in the ‘Personnel and materials hoist’ class (Schedule 3 item 20: use of a personnel and materials hoist, or of a materials hoist) for anyone who operates a personnel and materials hoist, including a rider who presses a control in the car; passengers who only ride are not carrying out high risk work and need no licence; the ‘Materials hoist’ class (item 19: use of a materials hoist) covers a materials hoist only, which carries things and substances and never people (Schedule 19)
  • Operator trained and verified as competent on the make and model of hoist, including its controls, emergency stop, emergency lowering and load and passenger limits
  • Landing and base workers trained in the signals, the gate and interlock rules, the loading limits and the emergency procedure
  • Erecting, climbing, altering and dismantling the hoist are outside this SWMS and need a separate SWMS; setting up or dismantling a hoist is rigging work (Schedule 19; Schedule 3 item 5 basic rigging covers hoists and item 6 adds hoists with jibs and self-climbing hoists), and a rigger with the qualifying licence who only sets up or dismantles a hoist does not need the operator class (WHS Regulation s 82(4))
  • Licensed electrician to connect the hoist to its supply and to carry out electrical repairs (Electrical Safety Act 2002 s 55)
  • Competent person to inspect, maintain and test the hoist to the maker’s recommendations and to sign it back into service after a repair
  • First aid equipment, facilities and trained first aiders as the work and site need, including someone who knows the hoist rescue plan (WHS Regulation s 42)
  • General construction induction training card (white card) for construction work, and a site induction that covers the hoist rules

Legislation and codes of practice referenced

  • Work Health and Safety Act 2011 (Qld)
  • Work Health and Safety Regulation 2011 (Qld)
  • Managing Risks of Plant in the Workplace Code of Practice 2021
  • Managing the Risk of Falls at Workplaces Code of Practice 2021
  • Hazardous Manual Tasks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021
  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Formwork Code of Practice 2016 (section 3.2.1: emergency access where a man and material hoist is available)
  • Electrical Safety Act 2002 (Qld)
  • Electrical Safety Regulation 2026 (Qld): s 140 for construction work, and the overhead electric line exclusion zones in schedule 2
  • Electrical Safety Code of Practice 2020 – Working near overhead and underground electric lines (distances come from the 2026 Regulation)

What you get

  • An editable Microsoft Word document (17 pages), laid out on A4 landscape pages. Type your business, client and job details once and they fill in on every page, with a space for your logo
  • 9 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
  • PPE listed for this job: safety boots; high-visibility clothing; hard hat, worn on landings and in the car; safety glasses
  • Emergency arrangements for: car stuck between landings or power failure, person injured, caught by the car or a gate, or fallen at a landing and contact with an overhead power line by the mast, car or a load
  • Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)

Adjust it for your site, plant and crew, and talk it through with your workers before work starts.

Checked against the Queensland laws and codes of practice listed above. Last reviewed October 2026.

Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.

How to use it

From download to site in three steps

Buy and download

Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.

Make it yours

Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.

Brief your crew

Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.

FAQ

Before you buy

Something else? Ask us and a real person will reply.

What format is it?

Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.

How do I get it after I pay?

Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.

Is it compliant with Queensland law?

It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.

What if it isn't right for my job?

If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.

Reviews

Only logged in customers who have purchased this product may leave a review.

More templates like this