Skip to content

Live Sewer Connection and Tie-In SWMS

Tying new pipework into live sewer mains in Queensland, covering sewer gas, biological hazards, trench collapse and flow control. An editable Word SWMS template for Queensland.

RG

Written by Ryan Graham, health and safety professional (16 years on Queensland sites)

$49.99 incl. GST

AUD · one-off purchase · instant download

  • Instant download · your links arrive by email straight after checkout and work for 3 months, so save your copy
  • Your business name and logo · we fill them into every document for A$29 (free on orders of A$500 or more), or edit it yourself in Microsoft Word
  • Quality guarantee · we'll fix any problem, then refund you or give store credit if you're still not happy
  • Secure checkout · card, Apple Pay or Google Pay through Stripe

About this template

Suits drainage, plumbing and civil contractors who connect new pipework into a live sewer main or manhole. It covers the sewer owner’s approval, trench security and shoring, gas testing, flow control, making the connection, testing and decontamination. Laying the sewer main and entering a sewer need their own SWMS.

High risk construction work items ticked: work near a confined space (the live sewer), a trench deeper than 1.5 metres, an area that may have a contaminated or flammable atmosphere (sewer gas) and the movement of powered mobile plant (WHS Regulation s 291(f), (g), (l) and (o)). Nobody enters the sewer under this SWMS. Tick the other items that apply, for example energised electrical services, a road in use, or gas or fuel lines. Drainage work may also need a licence under the Plumbing and Drainage Act 2018 (s 56).

New to SWMS? Read What Is A Safe Work Method Statement?

What Is Covered In Our Live Sewer Connection and Tie-In SWMS?

After the standard pre-start checks, the job steps run from “Plan the tie-in and get the sewer owner’s approval” to “Work in heat, rain and changing weather”. The hazards and controls include:

  • Sewer gas and low oxygen in the trench
  • Sewage splash and infection
  • Trench wall collapse
  • Sewage surge and plug blow-out
  • Striking underground services
  • Contact with overhead power lines
  • Excavator overturning at the trench edge
  • Dropped or swinging pipe and fittings
  • Silica dust and slurry from coring
  • Falling into the open trench
  • Traffic beside the work area
  • Heat and wet weather

High Risk Construction Work

These high risk construction work items (WHS Regulation 2011 (Qld) s 291) are already ticked because they are part of this work. Tick any others that apply to your job:

  • Is carried out in or near a confined space
  • Is carried out in or near a shaft or trench with an excavated depth greater than 1.5m, or a tunnel
  • Is carried out in an area that may have a contaminated or flammable atmosphere
  • Is carried out in an area at a workplace in which there is any movement of powered mobile plant

Licences, Training and Competency

  • Drainers licence (or plumbers licence) under the Plumbing and Drainage Act 2018 (Qld) where the work is drainage work (s 56), unless an exemption in s 58 applies, such as an unlicensed person doing drainage work while directly supervised by a licensee who is their employer or directed by their employer (s 58(1)(c), (2)); a QBCC contractor licence may also be required, and the QBCC can confirm which applies to the job
  • Written approval and conditions from the sewerage service provider for the connection, and any shutdown or flow control it requires
  • Confined space awareness training for every worker, so they recognise a live sewer pipe or manhole as a confined space and know nobody enters under this SWMS (WHS Regulation s 76)
  • Gas detector user trained and competent in testing, calibration checks and reading the instrument
  • Excavator operator trained and assessed as competent on the machine and attachments (no high risk work licence class applies to operating an excavator)
  • High risk work licence in the dogging class, or a higher rigging class (Schedule 3), for anyone who slings a load or directs the operator when the load is out of view (Schedule 19, dogging work)
  • Competent person to inspect the trench and shoring before entry and after rain or ground movement
  • General construction induction training card (white card) for construction work
  • First aider on site, briefed on infection risks, cuts and gas exposure
  • Site induction

Legislation and Codes of Practice Referenced

  • Work Health and Safety Act 2011 (Qld)
  • Work Health and Safety Regulation 2011 (Qld)
  • Plumbing and Drainage Act 2018 (Qld)
  • Plumbing and Drainage Regulation 2019 (Qld)
  • Confined Spaces Code of Practice 2021
  • Excavation Work Code of Practice 2021
  • Managing Risks of Plant in the Workplace Code of Practice 2021
  • Managing Risks of Hazardous Chemicals in the Workplace Code of Practice 2021
  • Hazardous Manual Tasks Code of Practice 2021
  • Managing Noise and Preventing Hearing Loss at Work Code of Practice 2021
  • Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements Code of Practice 2022
  • Managing the Work Environment and Facilities Code of Practice 2021
  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Traffic Management for Construction or Maintenance Work Code of Practice 2008
  • Safe Work Australia model Code of Practice: Managing the risks of biological hazards at work (guidance)
  • Electrical Safety Act 2002 (Qld)
  • Electrical Safety Regulation 2026 (Qld): exclusion zones for overhead lines (schedule 2) and damage to underground lines (ss 14-15)

What You Get

  • An editable Microsoft Word document (15 A4 landscape pages). Type your business, client and job details once and they fill in on every page, with a space for your logo
  • 11 job steps for this work, each with its hazards, controls, initial and residual risk scores and the person responsible
  • PPE listed for this job: waterproof gloves with cut protection, worn under or over disposable gloves for sewage contact; safety glasses and a face shield for splash risks
  • Emergency arrangements for: gas alarm or smell of sewer gas, trench collapse or person trapped and plug failure or sewage surge
  • Plus the parts every Work Safety QLD SWMS shares, from the s 291 checklist to the worker sign-on sheet (see the layout in our free SWMS template)

Adjust it for your site, plant and crew, and talk it through with your workers before work starts. Please make sure you read our Disclaimer before downloading this SWMS.

Checked against the Queensland laws and codes of practice listed above. Last reviewed November 2026.

Having trouble with your download? Contact us any time. Please read our Disclaimer before downloading.

How to use it

From download to site in three steps

Buy and download

Check out with card, Apple Pay or Google Pay. Your download buttons appear straight away and the links are emailed to you. Links work for 3 months, so save your copies.

Make it yours

Add your logo and business details in Word or Excel, or tick branding at checkout (A$29) and we add them. Then add your site and job details.

Brief your crew

Talk it through with the workers doing the job, have them sign on, and keep it on site. Review it whenever the job or conditions change.

FAQ

Before you buy

Something else? Ask us and a real person will reply.

What format is it?

Microsoft Word. Edit it in Word, or free in Word for the web, and add your own logo and business details. Or let us do it: tick "Add my business name and logo to every document" at checkout (A$29, free on orders of A$500 or more) and fill in a short form after payment.

How do I get it after I pay?

Your download buttons appear as soon as checkout finishes, and the links are emailed to you. You can re-download from your account at any time.

Is it compliant with Queensland law?

It's written around Queensland's Work Health and Safety Act 2011 and Regulation 2011. Tailor it to your site, consult your workers and review it whenever conditions change; no template can guarantee compliance on its own.

What if it isn't right for my job?

If it doesn't match its description or has a fault, tell us and we'll fix it. If you're still not happy, we'll refund you or give you store credit, your choice. Check the sample pages first, as we don't refund a change of mind.

Reviews

Only logged in customers who have purchased this product may leave a review.

More templates like this